2026 taxable assessment $79,300 × 1.3998%. Estimate—not a bill or account balance.
OPA also publishes a 2027 assessment of $84,500; it is not the 2026 billed-year value.
Land report
Vacant lot · Boyer Lofts LLC · assessed $79K (2026) · 2027 OPA assessment $85K. On the 600 block of Winton St.
“Open” reflects records available then historical records keep their source dates estimates are labeled
These curated questions are free. Choose one to open its cited answer.
BlockReport can explain a discrepancy, but it cannot rewrite an official City record. Use the agency that owns the underlying fact:

Property tax
BlockReport can calculate the annual tax from the City’s taxable assessment. Payments, credits, interest, and a current amount due live separately in Philadelphia Tax Center.
2026 taxable assessment $79,300 × 1.3998%. Estimate—not a bill or account balance.
OPA also publishes a 2027 assessment of $84,500; it is not the 2026 billed-year value.
A Tax Center balance is net of bills, payments, credits, interest, and adjustments. A credit—or an amount due—is not automatically “back taxes.”
OPA 3930651002026 taxable assessment equals the full assessed value.
$3,540.03 was recorded for this parcel in Philadelphia's June 2022 delinquency snapshot for 2016–2021. That amount may have been paid, reduced, or increased since; it is not a current payoff figure.
The snapshot’s 2022 context used $21,200 total assessment, $21,200 taxable, and $0 exempt/abated. Those historical fields can differ from today’s OPA exemption status.
A separate historical parcel ledger ending in 2016 records $3,589.29 and a lien entry. It is shown as historical context only.
For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”
built new under a 2026 permit.
View supporting records →Assessed at $85K, but it traded for $33,100 in 2025 — a 2.6× gap. Could be a non-market deed the record doesn't label, or an assessment that hasn't caught up.
View supporting records →City Property History
Every row successfully fetched for this report is counted below. Dataset availability and matching can differ from the City's interactive file; use the official link for current detail.
Feb 2, 2026 Issued
FOR THE ERECTION OF AN ATTACHED NEW STRUCTURE WITH A CELLAR AND AN ACCESSORY ROOF DECK (FOR RESIDENTIAL USE ONLY) WITH ROOF ACCESS STRUCTURE. SIZE AND LOCATION AS SHOWN IN THE APPLICATION / PLAN.
Jun 17, 2026 Issued
FOR THE ERECTION OF AN ATTACHED THREE (3) STORY STRUCTURE WITH A ROOF DECK AND ROOF DECK ACCESS STRUCTURE ABOVE. FOR USE AS A SINGLE FAMILY HOUSEHOLD LIVING. BUILDING TO BE SPRINKLERED IN ACCORDANCE WITH NFPA 13D THROUGHOUT. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. **A COVERED WALKWAY OR SIDEWALK CLOSURE SHALL BE REQUIRED WITHIN TEN (10) FEET OF THE BUILDING FACADE IN ACCORDANCE WITH SECTION 3306 OF THE 2018 IBC. SEPARATE BUILDING AND/OR STREETS DEPARTMENT PERMIT REQUIRED PRIOR TO THE START OF ANY WORK.** BLOWER DOOR TESTING SHALL BE PERFORMED IN ACCORDANCE WITH ASTM E 779 OR ASTM E 1827 BY AN APPROVED THIRD PARTY AGENCY.
STANDARD · Opened Jan 4, 2008 · completed Oct 22, 2009
STANDARD · Opened Jan 4, 2008 · completed Oct 22, 2009
STANDARD · Opened Oct 22, 2009 · completed Dec 8, 2009
STANDARD · Opened Sep 17, 2010
STANDARD · Opened Sep 17, 2010 · completed Oct 18, 2010
STANDARD · Opened Jun 1, 2012 · completed Jun 28, 2012
STANDARD · Opened May 29, 2013 · completed Sep 7, 2013
STANDARD · Opened Dec 20, 2013 · completed Mar 21, 2014
STANDARD · Opened Nov 21, 2014 · completed Aug 11, 2015
STANDARD · Opened Aug 11, 2015 · completed Aug 28, 2015
STANDARD · Opened Feb 18, 2016 · completed Feb 23, 2016
STANDARD · Opened Jun 9, 2016 · completed Jul 26, 2016
STANDARD · Opened Mar 27, 2017 · completed Jun 30, 2017
STANDARD · Opened Aug 7, 2018 · completed Sep 21, 2018
STANDARD · Opened Dec 20, 2018 · completed Jan 4, 2019
STANDARD · Opened Jun 4, 2019 · completed Sep 26, 2019
STANDARD · Opened Jan 24, 2020 · completed Feb 27, 2020
NOTICE OF VIOLATION · Opened Aug 5, 2021 · completed Sep 20, 2021
NOTICE OF VIOLATION · Opened Apr 29, 2022 · completed May 19, 2022
NOTICE OF VIOLATION · Opened Aug 30, 2022 · completed Oct 5, 2022
NOTICE OF VIOLATION · Opened Jan 26, 2023 · completed Feb 22, 2023
NOTICE OF VIOLATION · Opened May 9, 2023 · completed Jun 7, 2023
NOTICE OF VIOLATION · Opened Aug 25, 2023 · completed Oct 18, 2023
NOTICE OF VIOLATION · Opened Mar 1, 2024 · completed Mar 19, 2024
NOTICE OF VIOLATION · Opened Jun 17, 2024 · completed Aug 28, 2024
NOTICE OF VIOLATION · Opened May 19, 2025 · completed Jun 4, 2025
NOTICE OF VIOLATION · Opened Aug 21, 2025 · completed Sep 17, 2025
NOTICE OF VIOLATION · Opened Mar 2, 2026 · completed Mar 19, 2026
NOTICE OF VIOLATION · Opened May 4, 2026 · completed May 21, 2026
May 23, 2006 FAILED
Sep 17, 2010 FAILED
Sep 17, 2010 FAILED
Oct 18, 2010 CLOSED
Oct 18, 2010 FAILED
Oct 18, 2010 CLOSED
Dec 27, 2010 FAILED
Jan 20, 2011 CLOSED
Jun 1, 2012 FAILED
Feb 16, 2016 PASSED
Feb 17, 2016 PASSED
Feb 17, 2016 FAILED
Feb 23, 2016 PASSED
Mar 16, 2016 PASSED
Aug 5, 2021 FAILED
Sep 20, 2021 FAILED
Sep 20, 2021 PASSED
Apr 29, 2022 FAILED
May 19, 2022 FAILED
May 19, 2022 PASSED
Aug 30, 2022 FAILED
Oct 5, 2022 FAILED
Oct 5, 2022 PASSED
Jan 26, 2023 FAILED
Feb 15, 2023 FAILED
Feb 22, 2023 PASSED
May 9, 2023 FAILED
Jun 7, 2023 FAILED
Jun 7, 2023 PASSED
Aug 25, 2023 FAILED
Sep 20, 2023 FAILED
Mar 1, 2024 FAILED
Mar 15, 2024 FAILED
Jun 17, 2024 FAILED
Jul 1, 2024 FAILED
May 19, 2025 FAILED
Jun 4, 2025 FAILED
Aug 21, 2025 FAILED
Sep 17, 2025 PASSED
Mar 2, 2026 FAILED
Mar 16, 2026 FAILED
Mar 19, 2026 PASSED
May 4, 2026 FAILED
May 21, 2026 FAILED
May 21, 2026 PASSED
No building certifications matched this parcel in the fetched City dataset.
No business licenses matched this parcel in the fetched City dataset.
No appeals matched this parcel in the fetched City dataset.
City of Philadelphia OPA, L&I and Zoning Board records, shown as filed. A CLOSED investigation is an outcome label, not a missing visit; an appeal's application status and decision may differ.
Legal due diligence
These checks are triggered by this property’s actual City rows. They identify the controlling document to verify; they do not declare a use legal, a building safe, or title clear.
Why it mattersIssued work is not the same as approved final work. L&I uses final inspections and required certifications to close construction permits; expired, withdrawn, and completed are different City statuses.
Verify nextOpen the permit file and confirm final inspections, holds, and any resulting occupancy certificate.
Open the controlling City guidance ↗Why it mattersThat is historical evidence, not today’s amount due. A current exemption, payment, credit, or assistance agreement can coexist with an older snapshot row.
Verify nextCheck period balances and request a dated Property Payoff statement for settlement.
Open the controlling City guidance ↗Why it mattersA PASSED or FAILED value applies to that inspection visit. CLOSED is a separate source status; none of the three alone proves the parent permit or violation case closed—or describes today’s condition.
Verify nextOpen the parent case/permit for each material failure and confirm its later disposition.
Open the controlling City guidance ↗Why it mattersInstalled systems in mixed-use and larger buildings generally require periodic certification, but applicability and limited-area exceptions vary. A missing BIN/address join is not proof of a compliance failure.
Verify nextConfirm what system was installed and whether a current annual certificate is required and filed.
Open the controlling City guidance ↗Why it mattersA $1 or nominal deed can be a valid family, estate, or entity transfer. It does not establish a sale price, clear title, or by itself prove a tangled title.
Verify nextRead the recorded deed and have the title search confirm every grantor, grantee, estate/probate step, lien, and authority to sell.
Open the controlling City guidance ↗Why it mattersA closed case is materially better than an open one, but it does not by itself prove that every altered use, unit, or concealed condition matches today’s approvals.
Verify nextUse the closed cases to target the inspection and occupancy-file review.
Open the controlling City guidance ↗The seller must obtain Philadelphia’s certificate showing the base zoning, last use in the zoning record, and open violations. The City warns that it does not prove Building Code occupancy or show zoning overlays.
Next: Obtain the fresh certificate and compare it with the CO, permits, and Atlas overlays.
Official guidance ↗The Tax Center Property Payoff covers Real Estate Tax, Commercial Trash, and L&I abatement-work invoices. Philadelphia says it does not include business-tax debts or liens, water and sewer charges, or fines for code violations.
Next: Request the City statement effective through settlement; read every period and invoice.
Official guidance ↗OPA ownership, deed summaries, and a zero tax balance are not clear title. Mortgages, judgments, municipal claims, water liens, easements, heirs, and other encumbrances require separate searches.
Next: Use a Pennsylvania lawyer/title company and obtain owner’s title insurance; order the separate water search/payoff.
Official guidance ↗Separate water-lien guidance ↗Informational only—not a legal opinion, title report, code inspection, tax payoff, or substitute for a Pennsylvania lawyer, title company, inspector, or tax professional.
Rule-based groupings across this property's dated public records. Each flag shows the records that belong in the same verification step and where the inference stops.
More than one separately dated public record deserves a current-status check.
Evidence: $3,540 appeared in the City's June 2022 delinquency snapshot · a lien number appears in the historical tax ledger through 2016 · failed L&I inspection activity in 2021, 2022, 2023, 2024, 2025, 2026
Limit: A screening signal, not a foreclosure prediction. Tax entries are historical and must be verified with Philadelphia Revenue.
Transparent record rules, not a score or forecast. Each flag is a prompt to verify the cited records, not a prediction or allegation.
An empty lot: no building, just the land and its paper trail. The homeowner tools don't apply; the deed history, owner and zoning are below, and the analyst can trace what the owner holds citywide.
$4K · Jun 2022 delinquency snapshot historical lien entry · through 2016
Places where the city's own paperwork disagrees with itself. These are flags on the data — not problems with the property.
Assessed at $85K, but it traded for $33,100 in 2025 — a 2.6× gap. Could be a non-market deed the record doesn't label, or an assessment that hasn't caught up.
601 Winton St sits on the 600 block of Winton St. Open the block report to compare its parcels, ownership and public-record history.
See the whole block →Next door: 603 Winton St · 605 Winton St
This report was assembled Jul 10, 2026, 6:32 AM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.
Official city record ↗ · L&I history ↗ · See the whole block · Download this record (JSON)