2026 taxable assessment $501,600 × 1.3998%. Estimate—not a bill or account balance.
OPA also publishes a 2027 assessment of $4,944,700; it is not the 2026 billed-year value.
Apartment building report
6 stories · 33,489 sqft · IRMX · built 2024
Apartment building · 44 units · Gotham North LP · assessed $5.0M (2026) · 2027 OPA assessment $4.9M. On the 2000 block of N 2nd St.

Open the research chat with this property already in context. Curated questions are free.
“Open” reflects records available then historical records keep their source dates estimates are labeled
BlockReport can explain a discrepancy, but it cannot rewrite an official City record. Use the agency that owns the underlying fact:
Property tax
BlockReport can calculate the annual tax from the City’s taxable assessment. Payments, credits, interest, and a current amount due live separately in Philadelphia Tax Center.
2026 taxable assessment $501,600 × 1.3998%. Estimate—not a bill or account balance.
OPA also publishes a 2027 assessment of $4,944,700; it is not the 2026 billed-year value.
A Tax Center balance is net of bills, payments, credits, interest, and adjustments. A credit—or an amount due—is not automatically “back taxes.”
OPA 8810012462026 OPA taxes $501,600 of $5,016,000 assessed. The assessment fields alone do not identify a program, approval date, expiration, or buyer eligibility.
See the assessment math →Applying the same rate to the billed-year full assessment. OPA's numeric split does not say when or whether the current treatment changes.
See the assessment math →This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.
For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”
new construction appears in a 2023 permit with a reduced taxable assessment shown.
View supporting records →Every dated deed, permit, inspection, license, violation, certification, and appeal is placed on the City’s annual assessment line. Select a point to read what happened; the line is an assessment history—not a sale-price chart or appraisal. OPA has also published a 2027 assessment of $4,944,700; it is not yet the billed-year tax basis.
Assessment history · all dated City records marked on the line
Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.
This is a apartment building, recorded under the city's apartments category. The homeowner tools (rent estimate, homestead playbook) don't apply, so they're hidden. The full record and owner trail are below.
Records behind the chart
The chart above is the primary timeline. This drawer preserves every underlying dated row and its filed status for source-level review.
Appeal ZP-2025-000645 · Completed · Granted
Related permit ZP-2025-000645 · Permit applicaiton is for the conversion of four (4) artisan studios and artisan industrial spaces on the second floor to four (4) residential dwelling units in an existing structure. Total number of dwelling units in the structure shall in
Permit ZP-2025-000645 · Issued
Residential - Household Living - Multi-Family
License 0977458 · Active
Gotham North LP · Expires 2027-04-28
Case CF-2024-112309 · PASSED
The cited inspection visit was marked passed.
Case CF-2024-112309 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
Permit EP-2024-009716 · Completed
INSTALL (40) 150 AMP PANELS & FEEDERS & (5) 200 AMP PANELS & FEEDERS INSTALL WIRING THROUGHOUT THE COMMON AREAS, PARKING GARAGE, FORTY DWELLING UNITS & FIVE ARTISAN STUDIOS. INSTALL LIGHTS (NORMAL & EMERGENCY), SWITCHES, SENSORS, LIGHTING CONTROLS, RECEPTACLES, & SMOKE ALARMS. PROVIDE POWER FOR THE MECHANICAL, HVAC, & ELEVATOR EQUIPMENT AS PER 2017 NEC. INCOMING SERVICE IS EXISTING. INSTALL A NEW FIRE ALARM SYSTEM & 2-WAY COMMUNICATION SYSTEM THROUGHOUT AS PER 2016 NFPA 72.
Case CF-2024-112309 · Violation VI-2024-086373 · Code F-1103.3.4 · COMPLIED
Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.
Case CF-2024-112309 · Violation VI-2024-086392 · Code F-912.7 · COMPLIED
Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.
Case CF-2024-112309 · Violation VI-2024-086391 · Code F-1013.1 · COMPLIED
Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.
Case CF-2024-112309 · Violation VI-2024-086372 · Code F-105.6.3 · COMPLIED
Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.
Case CF-2024-112309 · Violation VI-2024-086371 · Code F-903.5 · COMPLIED
Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.
Case CF-2024-112309 · Violation VI-2024-086370 · Code F-901.6.4 · COMPLIED
Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.
Permit MP-2024-003636 · Completed
FOR THE INSTALLATION OF A NEW HVAC SYSTEMS, ASSOCIATED DUCT WORK, ROOFTOP UNITS, DUCTLESS SYSTEMS, AND REGISTERS/DIFFUSERS AS PER APPROVED PLANS. SEPARATE PERMIT REQUIRED FOR ELECTRICAL, PLUMBING, FIRE SUPPRESSION.
Permit PP-2024-005536 · Completed
Provide rough and finish sanitary and domestic service as described in plans. Included are 2 sewage ejectors, 1 elevator sump pump, 1 water booster pump. Backflow devise was addressed by others in permit #PP-2023-012673
Permit FP-2024-000088 · Completed
INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 4" MAIN FIRE SERVICE LINE WITH A 4" AMES COLT 200 BACKFLOW PREVENTION ASSEMBLY AND TWO (2) STANDPIPE RISERS COMPLYING WITH NFPA 14 AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
Permit EP-2023-008063 · Completed
INSTALL A 1200 AMP 120/208V/ 3 PHASE SERVICE, (45) GANG 1200 AMP METER BANK, 400 AMP SERVICE TO THE HOUSE PANEL. ALL WORK IN ACCORDANCE WITH THE 2017 NEC. * SERVICE WORK ONLY. ** THIS PERMIT EXCLUDES THE FOLLOWING: FIRE PUMP, MECHANICAL, HVAC, & ELEVATOR EQUIPMENT, UNIT PANELS & FEEDERS, COMMON AREA WIRING, BRANCH WIRING & FIRE ALARM.
Permit SP-2023-000757 · Completed
FOR SITEWORK AND ONSITE UTILITY TO ACCOMMODATE THE NEW 8" STORMWATER DRAINAGE SYSTEM. ALL WORK PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.
Permit PP-2023-012673 · Completed
INSTALL 2" WDP, SANITARY AND STORM MD, CT, FAI & 2" BACKFLOW DEVICE
Permit CP-2022-006787 · Completed
For the erection of a new, six (6) story attached structure (w/roof access structure for mechanical/green roof access only), to be used as Groups B/R-2/S-2 (Artist Studios (uses as per owner's memo, no uses that can be classified as Groups F-1/F-2, not to be rented out as dwelling units) at 1st-2nd floors, Forty (40) Dwelling Units at 2nd-6th floors, and accessory parking garage at 1st floor, with utilities only within the basement), as per plans; separate permits required for all MEP/FSP work; building to be fully sprinklered throughout in accordance with NFPA 13, with standpipes installed within the exit stairways in accordance with NFPA 14, and a fire alarm system installed in accordance with NFPA 72; if field conditions vary, contact design engineer prior to the start of any work; covered walkway or sidewalk closure shall be required within fifteen (15) feet of the building facade in accordance with Section 3306 in the 2018 IBC (separate building and/or Streets Department permit required prior to start of any work); fire watch required once combustible construction is over 40 feet in height; a site safety plan shall be submitted to the building inspector prior to the start of any construction; see ZP-2022-002270 for zoning/use approval; see SR-2021-008257 for work within the public right-of-way.
Case CF-2023-016105 · PASSED
The cited inspection visit was marked passed.
Case CF-2023-016105 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
Case CF-2023-016105 · Violation VI-2023-012102 · Code PM15-315.2 · COMPLIED
Resolution: COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.
Permit EP-2020-005785 · Completed
Install throughout High-Rise & Four Story Building- Emergency Voice Evacuation System and Addressable Fire Alarm System w/ low frequency sound in all living rms and bedrooms, Fire Fighter Jacks, Tamper Switches ,Flow Switches ,Smoke Detectors, Heat Detectors Elevator recall, Wp Speaker strobes. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE.
Permit ZP-2022-002270 · Completed
FOR THE ERECTION OF A SEMI-DETACHED STRUCTURE WITH A GREEN ROOF. SIZE AND LOCATION AS SHOWN ON PLANS.
Permit EP-2021-014895 · Completed
Install all new wiring throughout Commercial Coffee shop fit-out. Install all new circuits and show window receptacles. Main electrical service existing. FALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC. **NO FIRE ALARM IS ON THIS PERMIT**
Permit PP-2021-023886 · Completed
Alterations: Interior plumbing. All proposed work to be done in accordance with Philadelphia Plumbing Code 2018.
Permit CP-2021-006767 · Expired
FOR THE CONSTRRUCTION OF A FOUR-STORY STRUCTURE WITH GREEN ROOF AND PRIVATE ROOF DECKS, FOR USE AS TWENTY-SIX (26) DWELLING UNITS, AS PER APPROVED PLANS.
Permit EP-2021-014900 · Completed
Rough-In Permit for EP-2021-014895 Install all new wiring throughout Commercial Coffee shop fit-out. Install all new circuits as per plans. Main electrical service existing. Fire Alarm by others as per 2017 nec
Permit CP-2021-007919 · Completed
FOR A LEVEL II INTERIOR ALTERATION TO A PORTION OF THE FIRST FLOOR OF AN EXISTING BUILDING. ALTERATION TO CONSIST OF THE INITIAL FIT-OUT OF A SIT-DOWN RESTAURANT(CAFE) WITH RETAIL SALE OF CONSUMER GOODS. ALTERATIONS TO INCLUDE THE ERECTION OF NEW WALL PARTITIONS AND TO PROVIDE FINISHES AND FURNISHINGS THROUGHOUT . ALL WORK TO BE DONE PER APPROVED PLANS.**BUILDING IS FULLY SPRINKLERED**IEBC 2018** IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK.** SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK**ANY DEVIATION TO THE APPROVED SCOPE OF WORK WILL REQUIRED AN AMENDED PERMIT**
Permit ZP-2021-002612 · Issued
FOR THE ERECTION OF AN ATTACHED STRUCTURE TO INCLUDE ROOF DECK STRUCTURE AND GREEN ROOF. (SEE PLANS UNDER APPROVED PERMIT ZP-2020-002762 TO INCLUDE STREETS DEPT AND CITY PLANNING COMMISSION APPROVAL) 12/14/2021: AMENDMENT TO REMOVE ROOF DECK PROPOSAL WITH INSTALLATION OF GREEN ROOF STRUCTURE. SIZE AND LOCATION AS PER PLANS.
Permit FP-2020-002073 · Completed
For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using an existing fire service line and backflow from the existing 10-story building, as per PWD Utility Plan dated 4/17/2019), throughout a new four (4) story attached structure (Phase 2; Unit #6), to be used as Group R-3 (SFD) as part of a set of twelve (12) Group R-3 townhomes, as per plans and hydraulic calculations; see AP#962296 for building permit; see AP#1014508 for Phase 1 sprinkler permit (existing ten-story building, parking garage, addition); see FP-2020-001286 for Phase 2 standpipes and parking garage sprinklers.
Permit FP-2020-002063 · Completed
For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using an existing fire service line and backflow from the existing 10-story building, as per PWD Utility Plan dated 4/17/2019), throughout a new four (4) story attached structure (Phase 2; Unit #4), to be used as Group R-3 (SFD) as part of a set of twelve (12) Group R-3 townhomes, as per plans and hydraulic calculations; see AP#962296 for building permit; see AP#1014508 for Phase 1 sprinkler permit (existing ten-story building, parking garage, addition); see FP-2020-001286 for Phase 2 standpipes and parking garage sprinklers.
Permit FP-2020-002079 · Completed
For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using an existing fire service line and backflow from the existing 10-story building, as per PWD Utility Plan dated 4/17/2019), throughout a new three (3) story attached structure (Phase 2; Unit #8), to be used as Group R-3 (SFD) as part of a set of twelve (12) Group R-3 townhomes, as per plans and hydraulic calculations; see AP#962296 for building permit; see AP#1014508 for Phase 1 sprinkler permit (existing ten-story building, parking garage, addition); see FP-2020-001286 for Phase 2 standpipes and parking garage sprinklers.
Permit FP-2020-002062 · Completed
For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using an existing fire service line and backflow from the existing 10-story building, as per PWD Utility Plan dated 4/17/2019), throughout a new four (4) story attached structure (Phase 2; Unit #3), to be used as Group R-3 (SFD) as part of a set of twelve (12) Group R-3 townhomes, as per plans and hydraulic calculations; see AP#962296 for building permit; see AP#1014508 for Phase 1 sprinkler permit (existing ten-story building, parking garage, addition); see FP-2020-001286 for Phase 2 standpipes and parking garage sprinklers.
Permit FP-2020-002078 · Completed
For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using an existing fire service line and backflow from the existing 10-story building, as per PWD Utility Plan dated 4/17/2019), throughout a new three (3) story attached structure (Phase 2; Unit #7), to be used as Group R-3 (SFD) as part of a set of twelve (12) Group R-3 townhomes, as per plans and hydraulic calculations; see AP#962296 for building permit; see AP#1014508 for Phase 1 sprinkler permit (existing ten-story building, parking garage, addition); see FP-2020-001286 for Phase 2 standpipes and parking garage sprinklers.
Permit FP-2020-002083 · Completed
For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using an existing fire service line and backflow from the existing 10-story building, as per PWD Utility Plan dated 4/17/2019), throughout a new three (3) story attached structure (Phase 2; Unit #12), to be used as Group R-3 (SFD) as part of a set of twelve (12) Group R-3 townhomes, as per plans and hydraulic calculations; see AP#962296 for building permit; see AP#1014508 for Phase 1 sprinkler permit (existing ten-story building, parking garage, addition); see FP-2020-001286 for Phase 2 standpipes and parking garage sprinklers.
Permit PP-2020-013651 · Completed
Storm & sanitary curb traps, fresh air inlets & main drains. PPC 2018 The work done in June was on the N Phillip St side, This work is on the N 2nd St Side
Permit FP-2020-002081 · Completed
For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using an existing fire service line and backflow from the existing 10-story building, as per PWD Utility Plan dated 4/17/2019), throughout a new three (3) story attached structure (Phase 2; Unit #10), to be used as Group R-3 (SFD) as part of a set of twelve (12) Group R-3 townhomes, as per plans and hydraulic calculations; see AP#962296 for building permit; see AP#1014508 for Phase 1 sprinkler permit (existing ten-story building, parking garage, addition); see FP-2020-001286 for Phase 2 standpipes and parking garage sprinklers.
Permit FP-2020-002061 · Completed
For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using an existing fire service line and backflow from the existing 10-story building, as per PWD Utility Plan dated 4/17/2019), throughout a new four (4) story attached structure (Phase 2; Unit #2), to be used as Group R-3 (SFD) as part of a set of twelve (12) Group R-3 townhomes, as per plans and hydraulic calculations; see AP#962296 for building permit; see AP#1014508 for Phase 1 sprinkler permit (existing ten-story building, parking garage, addition); see FP-2020-001286 for Phase 2 standpipes and parking garage sprinklers.
Permit FP-2020-002080 · Completed
For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using an existing fire service line and backflow from the existing 10-story building, as per PWD Utility Plan dated 4/17/2019), throughout a new three (3) story attached structure (Phase 2; Unit #9), to be used as Group R-3 (SFD) as part of a set of twelve (12) Group R-3 townhomes, as per plans and hydraulic calculations; see AP#962296 for building permit; see AP#1014508 for Phase 1 sprinkler permit (existing ten-story building, parking garage, addition); see FP-2020-001286 for Phase 2 standpipes and parking garage sprinklers.
Permit FP-2020-002072 · Completed
For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using an existing fire service line and backflow from the existing 10-story building, as per PWD Utility Plan dated 4/17/2019), throughout a new four (4) story attached structure (Phase 2; Unit #5), to be used as Group R-3 (SFD) as part of a set of twelve (12) Group R-3 townhomes, as per plans and hydraulic calculations; see AP#962296 for building permit; see AP#1014508 for Phase 1 sprinkler permit (existing ten-story building, parking garage, addition); see FP-2020-001286 for Phase 2 standpipes and parking garage sprinklers.
Permit FP-2020-002082 · Completed
For the installation of an automatic wet sprinkler system in accordance with NFPA 13R (using an existing fire service line and backflow from the existing 10-story building, as per PWD Utility Plan dated 4/17/2019), throughout a new three (3) story attached structure (Phase 2; Unit #11), to be used as Group R-3 (SFD) as part of a set of twelve (12) Group R-3 townhomes, as per plans and hydraulic calculations; see AP#962296 for building permit; see AP#1014508 for Phase 1 sprinkler permit (existing ten-story building, parking garage, addition); see FP-2020-001286 for Phase 2 standpipes and parking garage sprinklers.
Permit FP-2020-001286 · Completed
INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13R THROUGHOUT UNIT 1 AS PER APPROVED PLANS SEE 1014508 FOR CU100 FORM. SYSTEM TO TIE INTO EXISTING FIRE SERVICE LINE AND BACKFLOW PREVENTION ASSEMBLY. SEPARATE FIRE SUPPRESSION PERMITS REQUIRED FOR UNITS 2-12. INSTALLATION OF NFPA 13 DRY AUTOMATIC FIRE SUPPRESSION SYSTEM AND STANDPIPE IN PARKING GARAGE TO TIE INTO EXISTING SYSTEM APPROVED UNDER 1014508 PER APPROVED PLANS. AMENDMENT AS OF 11/20/2020: PREVIOUS DOCUMENTATION STAMPED BY L&I
Permit MP-2020-003090 · Completed
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. INSTALLATION OF (1) 80,000 BTU 95% GAS FURNACE WITH 3 TON AC AND ALL REQUIRED DUCT WORK. 14 REGISTERS
Permit MP-2020-003085 · Completed
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
Permit MP-2020-003089 · Completed
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
Permit MP-2020-003094 · Completed
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
Permit MP-2020-003093 · Completed
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
Permit MP-2020-003083 · Completed
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
Permit MP-2020-003087 · Completed
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
Permit MP-2020-003091 · Completed
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
Permit MP-2020-003084 · Completed
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
Permit MP-2020-003088 · Completed
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
Permit MP-2020-003086 · Completed
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
Permit MP-2020-003092 · Completed
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES - For the installation of New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. EACH HVAC UNIT TO BE SELF-CONTAINED WITHIN EACH DWELLING UNIT. NO PENETRATIONS OF RATED ASSEMBLIES.
Permit EP-2020-005803 · Expired
INSTALL 200A 120/240V 1 PH MAIN SERVICE. INSTALL 40 CIRCUIT MAIN BREAKER PANEL. INSTALL ALL WIRING THROUGHOUT SFD. INSTALL CABLE TV WIRING AS PER 2014 NEC
Permit EP-2020-005801 · Completed
INSTALL 200A 120/240V 1 PH MAIN SERVICE. INSTALL 40 CIRCUIT MAIN BREAKER PANEL. INSTALL ALL WIRING THROUGHOUT SFD. INSTALL CABLE TV WIRING AS PER 2014 NEC
Permit EP-2020-005805 · Completed
INSTALL 200A 120/240V 1 PH MAIN SERVICE. INSTALL 40 CIRCUIT MAIN BREAKER PANEL. INSTALL ALL WIRING THROUGHOUT SFD. INSTALL CABLE TV WIRING AS PER 2014 NEC
Permit EP-2020-005795 · Completed
INSTALL 200A 120/240V 1 PH MAIN SERVICE. INSTALL 40 CIRCUIT MAIN BREAKER PANEL. INSTALL ALL WIRING THROUGHOUT SFD. INSTALL CABLE TV WIRING AS PER 2014 NEC
Permit EP-2020-005793 · Completed
INSTALL 200A 120/240V 1 PH MAIN SERVICE. INSTALL 40 CIRCUIT MAIN BREAKER PANEL. INSTALL ALL WIRING THROUGHOUT SFD. INSTALL CABLE TV WIRING AS PER 2014 NEC
Permit EP-2020-005804 · Completed
INSTALL 200A 120/240V 1 PH MAIN SERVICE. INSTALL 40 CIRCUIT MAIN BREAKER PANEL. INSTALL ALL WIRING THROUGHOUT SFD. INSTALL CABLE TV WIRING AS PER 2014 NEC
Permit EP-2020-005799 · Completed
INSTALL 200A 120/240V 1 PH MAIN SERVICE. INSTALL 40 CIRCUIT MAIN BREAKER PANEL. INSTALL ALL WIRING THROUGHOUT SFD. INSTALL CABLE TV WIRING AS PER 2014 NEC
Permit EP-2020-005797 · Completed
INSTALL 200A 120/240V 1 PH MAIN SERVICE. INSTALL 40 CIRCUIT MAIN BREAKER PANEL. INSTALL ALL WIRING THROUGHOUT SFD. INSTALL CABLE TV WIRING AS PER 2014 NEC
Permit EP-2020-005806 · Completed
INSTALL 200A 120/240V 1 PH MAIN SERVICE. INSTALL 40 CIRCUIT MAIN BREAKER PANEL. INSTALL ALL WIRING THROUGHOUT SFD. INSTALL CABLE TV WIRING AS PER 2014 NEC
Permit EP-2020-005810 · Completed
INSTALL 200A 120/240V 1 PH MAIN SERVICE. INSTALL 40 CIRCUIT MAIN BREAKER PANEL. INSTALL ALL WIRING THROUGHOUT SFD. INSTALL CABLE TV WIRING AS PER 2014 NEC
Permit EP-2020-005800 · Completed
INSTALL 200A 120/240V 1 PH MAIN SERVICE. INSTALL 40 CIRCUIT MAIN BREAKER PANEL. INSTALL ALL WIRING THROUGHOUT SFD. INSTALL CABLE TV WIRING AS PER 2014 NEC
Permit EP-2020-005812 · Completed
INSTALL 200A 120/240V 1 PH MAIN SERVICE. INSTALL 40 CIRCUIT MAIN BREAKER PANEL. INSTALL ALL WIRING THROUGHOUT SFD. INSTALL CABLE TV WIRING AS PER 2014 NEC
Permit EP-2020-005796 · Completed
INSTALL 200A 120/240V 1 PH MAIN SERVICE. INSTALL 40 CIRCUIT MAIN BREAKER PANEL. INSTALL ALL WIRING THROUGHOUT SFD. INSTALL CABLE TV WIRING AS PER 2014 NEC
Permit MP-2020-001891 · Completed
EZ PERMIT DUCTWORK & WARM-AIR APPLIANCES- For the installation if New Ductwork, Registers/Grilles/Diffusers, and Warm-Air Appliances as per attached standards. Deviations from these standards require submission of construction and site plans. install 2 ton heat pump and ductwork
Permit PP-2020-003349 · Completed
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.
Permit 1047665 · Completed
Amending original electrical permit 987996 to split into 3 permits for particua scope of work. This permit application is for rough from electric for residential, commercial and common areas in rehab building only.
Permit 1047677 · Completed
Amending original electrical permit 987996 to split into 3 permits for particua scope of work. This permit application is for rough and final electrical work for new construction.
Permit 1008130 · Completed
FOR THE INSTALLATION OF NEW MECHANICAL/HVAC SYSTEMS THROUGHOUT AN EXISTING TEN (10) STORY BUILDING USED AS GROUPS A-3/B/R-2 (PHASE 1), AS PER PLANS; SEE AP#928441 FOR PHASE 1 BUILDING PERMIT.
Permit 951586 · Completed
ALTERATION: INTERIOR PLUMBING; REHAB OF EXISTING 10 STORY BUILDING WITH 84 DWELLING UNITS INTO MIXED USE BUILDING; VARIANCE ISSUED JUNE 7, 2019 GRANTED USE OF PEX SUPPLY PIPING FROM MANIFOLD TO SERVE WITHI DEMISED RESIDENTIAL UNITS; NO STORM OR FUEL GAS PIPING INCLUDED WITHIN THIS PERMIT, SEPARATE PERMIT REQUIRED -THE INSTALLATION WILL COMPLY WITH THE PHILADEPHIA PLUBMING CODE 2004 SIXTH PRINTING (FEBRUARY 2019)REHAB OF EXISTING BUILDING INTO MIXED USE BUILDING. USE OF PEX SUPPLY PIPING FROM MANIFOLD TO SERVE WITHI DEMISED RESIDENTIAL UNITS. THE INSTALLATION WILL COMPLY WITH THE 2004 PLUMBING CODE.
Permit 951644 · Completed
NEW CONSTRUCTION:ONE(1) FOUR(4) STORY ADDITION WITH GREEN ROOF AND ROOF DECKS FOR A MULTI-FAMILY HOUSEHOLD LIVING ( 30 DWELLING UNITS) AND ONE(1) VACANT COMMERCIAL SPACE AT FIRST FLOOR TO AN EXISTING STRUCTURE FOR A FOR A VACANT COMMERCIAL SPACE AT FIRST FLOOR IN THE SAME BUILDING WITH MULTI-FAMILY HOUSEHOLD LIVING ( 90 DWELLING UNITS) FROM SECOND FLOOR THROUGH TENTH FLOORS WITH PROPOSED GREEN ROOF, ROOF DECK , PILOTHOUSE AND PENTHOUSE ; DWELLINGS WITH USE OF PEX AND PVC IN RESIDENTIAL UNITS. THE INSTLLATION WILL COMPLY WITH THE 2004 PHILA PLUMB CODE.see application 951586 for plans
Permit 1014508 · Completed
INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING SERVICE BY EXISTING MAIN FIRE SERVICE AND BACKFLOW PREVENTION ASSEMBLY WITH NEW REPLACEMENT AURORA UL LISTED FIRE PUMP COMPLYING WITH NFPA 20 AS PER APPROVED PLANS. NO WORK TO EXISTING STANDPIPE SYSTEM. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
Permit 987996 · Completed
INSTALL NEW 3000 AMP SERVICE, APT PANELS, HOUSE PANELS, AND METERING. WIRE 100 NEW APTS FOR LIGHTS, POWER, COMMUNICATIONS, AND HVAC AS PER 2008 NEC. (NC DISTRICT)***NO FIRE ALARM ON THIS PERMIT***
Permit 885695 · Completed
FOR THE ERECTION OF LIGHT-FRAMED ATTACHED STRUCTURES TO INCLUDE STEEL FRAMING, CONCRETE FOUNDATIONS, ELEVATED EGRESS PLATFORM, FIRE WALLS, RATED FLOOR/CEILING ASSEMBLIES, AND GREEN ROOF INSTALLATION. **SEPARATE PERMITS REQ'D FOR ELECTRICAL, PLUMBING, MECHANICAL, AND FIRE SUPPRESSION SYSTEM INSTALLATIONS. SEPARATE PERMITS REQ'D PRIOR TO OCCUPANCY OF COMMERCIAL GRD FLR TENANT SPACE.**
Permit 928441 · Completed
FOR ALTERATIONS TO AN EXISTING, NON-COMBUSTIBLE STRUCTURE TO INCLUDE THE ERECTION OF A RATED ELEVATOR SHAFT ENCLOSURE, ASSOCIATED ELEVATOR MACHINE ROOM, RATED CORRIDOR WALLS, INTERIOR WALL PARTITIONS, AND WALL/FLOOR/CEILING FINISHING. **SEPARATE PERMITS FROM DEPT OF LABOR & INDUSTRY REQ'D FOR INSTALLATION OF HOIST LIFT. SEPARATE PERMITS REQUIRED FOR FIT OUT AND OCCUPANCY OF COMMERCIAL SPACES. SEPARATE ELECTRICAL, MECHANICAL, AND FIRE SUPPRESSION PERMITS TO BE REQUIRED.** (SEE PLANS UNDER AP#885695) 3/18/2021: FOR AMENDMENT TO REVISE THE LAYOUT AT ELEVATOR MACHINE ROOM ACCESS STAIRS AND THE 2ND STORY FOR RECONFIGURATION OF TENANT SPACES.
What this record suggests
The City file documents 66 permits touching electrical work, plumbing, roof work, windows. 64 carries a completed, issued, or approved status; that documents the filing, not the present quality of the work.
Gotham North LP · corporate / LLC owner
• Tax bills mail to 1247 E Columbia Ave, Philadelphia PA, 19125
• Holds an active rental license for this address
2034 N 2nd St sits on the 2000 block of N 2nd St. Open the block report to compare its parcels, ownership and public-record history.
See the whole block →Next door: 2036-48 N 2nd St · 2050 N 2nd St
This report was assembled Jul 10, 2026, 10:04 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.