2026 taxable assessment $649,900 × 1.3998%. Estimate—not a bill or account balance.
OPA also publishes a 2027 assessment of $774,500; it is not the 2026 billed-year value.
House report
3 bd · 2 ba · 2 stories · 2,126 sqft · RM1 · built 2014
Owner-occupancy signal · assessed $750K (2026) · 2027 OPA assessment $775K · sold 2×. On the 800 block of S 19th St.

Open the research chat with this property already in context. Curated questions are free.
“Open” reflects records available then historical records keep their source dates estimates are labeled
BlockReport can explain a discrepancy, but it cannot rewrite an official City record. Use the agency that owns the underlying fact:
Property tax
BlockReport can calculate the annual tax from the City’s taxable assessment. Payments, credits, interest, and a current amount due live separately in Philadelphia Tax Center.
2026 taxable assessment $649,900 × 1.3998%. Estimate—not a bill or account balance.
OPA also publishes a 2027 assessment of $774,500; it is not the 2026 billed-year value.
A Tax Center balance is net of bills, payments, credits, interest, and adjustments. A credit—or an amount due—is not automatically “back taxes.”
OPA 3013969002026 OPA removes $100,000 from the taxable assessment through the owner-occupant exemption.
This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.
For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”
demolition was recorded in 2014, followed by a 2013 construction permit and a $675K transfer in 2015.
View supporting records →Every fetched annual City assessment for this house, compared with its block and ZIP. The figures show assessment change, the billed-year tax estimate, dated tax records, and recorded transfers. They do not estimate market appreciation or investment return.
Assessment vs. the block and ZIP · every dated City record marked on the line
Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.
demolition was recorded in 2014, followed by a 2013 construction permit and a $675K transfer in 2015.
Records behind the chart
The chart above is the primary timeline. This drawer preserves every underlying dated row and its filed status for source-level review.
Permit GM-2020-005030 · Completed
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.
2015
Permit 510478 · COMPLETED
CONSTRUCT A THREE STORY SINGLE FAMILY DWELLING STRUCTURE WITH CELLAR. REAR 2ND FLOOR ROOF DECK WITH OPEN SPIRAL STAIR CONNECTING TO THIRD FLOOR ROOF TOP DECK. FRONT AND SIDE 2 STORY BAY. *** THE LISTED GENERAL CONTRACTOR LILY CONSTRUCTION HAS NO EMPLOYEES AS PER NOTARIZED LETTER. ALL SUB-CONTRACTORS ARE TO BE LICENSED IN THE CITY OF PHILADELPHIA, AND LISTED ON PERMIT. A SUB-CONTRACTORS LIST IS TO BE GIVEN TO THE INSPECTOR BEFORE ANY WORK STARTS.
Case 434352 · PASSED
The cited inspection visit was marked passed.
Case 434352 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
Case 434352 · Violation 3207488 · Code A-504.1/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
Case 434352 · Violation 3207487 · Code A-104.1/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
Permit 536509 · COMPLETED
LATERAL & CURB TRAP (SFD)"SELF-CERTIFICATION'S ARE NO LONGER PERMITTED" - "ALL EXCAVATIONS AND PLUMBING TRENCHES IN EXCESS OF 5 FT IN DEPTH MUST HAVE APPROVED SHORING IN PLACE AT THE TIME OF INSPECTION"PA20141331082
Permit 533490 · COMPLETED
WIRING THROUGHOUT AS PER NEC 2008 (SFD)
Permit 527103 · COMPLETED
FOR THE INSTALLATION OF A FIRE SUPPRESSION SYSTEM IN ACCORDANCE WITH NFPA 13D WITH A NEW ONE-INCH FIRE SERVICE LINE AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
Case 301315 · CLOSED
A follow-up before or during enforcement escalation; confirm the case sequence in the City file. City marked the record closed; open the case for the closing reason.
Case 238706 · CLOSED
A legacy L&I inspection label. The unit inspected housing for property-maintenance, fire-prevention, and related code compliance; the separate status says how that visit ended. City marked the record closed; open the case for the closing reason.
Permit 526673 · COMPLETED
ROUGH & FINISH PLUMBING 2 1/2 BATH, KITCHEN & LAUNDRY (SFD)
Permit 520066 · COMPLETED
INSTALL 2 HVAC UNITS WITH DUCTWORK(SFD)
Case 510478 · Violation 3068150 · Code A-104.1/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
Permit 486412 · COMPLETED
COMPLETE DEMOLITION OF EXISTING THREE STORY SINGLE FAMILY ROW HOME AS PER ENGINEER'S PLANS & SPECIFICATIONS TO MEET CODE BULLETIN B-1302. SAFETY PLAN MUST BE ON-SITE AT ALL TIMES*SEE STREETS DEPARTMENT FOOTWAY CLOSURE PERMIT #2013-10167*
Permit 494128 · COMPLETED
ERECT THREE (3) STORY SINGLE FAMILY DWELLING WITH CELLAR AND 2ND FLOOR REAR ROOF DECK TO INCLUDE OPEN SPIRAL STAIR CONNECTING TO 3RD FLOOR ROOF DECK.
Permit 491992 · COMPLETED
DEMOLISH EXISTING STRUCTURE 3 STORY INFILL EXISTING CELLAR TO BECOME VACANT LOT
Permit 487221 · COMPLETED
INTERIOR ALTERATIONS TO INCLUDE INTERIOR DEMOLITION ONLY (NO STRUCTURAL ELEMENTS). APPLICANT AGREES TO LIMIT THE CONSTRUCTION TO COMPLY WITH EZ PERMIT STANDARD FOR INTERIOR ALTERATIONS, DATED JANUARY 2011. DEVIATION FROM THE STANDARD WILL RESULT IN REVOCATION OF THIS PERMIT AND IMPOSITION OF FURTHER PENALTIES.
Case 301315 · Violation 2686831 · Code PM-302.4/7 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
Case 301315 · Violation 2686832 · Code PM-304.5/2 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
Case 301315 · Violation 2686833 · Code PM-304.5/3 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
Case 301315 · Violation 2686834 · Code PM-306.2/4 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
Case 301315 · Violation 2686830 · Code PM-102.4/2 · COMPLIED
This usually records a requirement to obtain a Vacant Structure License for an unoccupied residential building. Check later license and compliance rows because it does not establish present vacancy or an unresolved violation. City marked this violation complied with; check the resolution date and live case for what was accepted.
Case 238706 · Violation 1888668 · Code PM-302.7/1 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
Case 238706 · Violation 1888669 · Code PM-102.4/2 · COMPLIED
This usually records a requirement to obtain a Vacant Structure License for an unoccupied residential building. Check later license and compliance rows because it does not establish present vacancy or an unresolved violation. City marked this violation complied with; check the resolution date and live case for what was accepted.
Case 238706 · Violation 1888671 · Code PM-302.2/2 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
Case 238706 · Violation 1888670 · Code PM-306.0/1 · COMPLIED
A legacy L&I label associated with vacant-property requirements. It may concern licensing, securing, or maintaining a vacant structure; the notice and cited code control, and this row alone does not prove the property is vacant now. City marked this violation complied with; check the resolution date and live case for what was accepted.
What this record suggests
The City file documents 11 permits touching kitchen work, bathroom work, electrical work, plumbing. 11 carries a completed, issued, or approved status; that documents the filing, not the present quality of the work.
Informational only — not investment advice or a consumer report (FCRA).
The city assessor's field record — the physical spec sheet behind the assessed number.
OPA field-assessment attributes. Condition and grade are the assessor's codes, not an inspection.
What owning 814 S 19th St takes, at your price and your rate. Taxes start with an annual estimate from the City’s taxable assessment, not a current bill or balance; rent starts at the area median. Assessed value is not an asking price — set the price slider to the real one.
When this house last sold (2015) a 30-year mortgage ran about 3.85% — Freddie Mac's average that year.
Scenario for orientation, not advice. Assumes a 30-year fixed loan, $1,400/yr insurance, 1% of price/yr maintenance, and buyer cash equal to the down payment plus 4%. Taxes use this parcel's taxable assessment, not a live Tax Center balance. Cash flow and returns exclude vacancy, management, utilities, HOA or condo fees, leasing costs, income tax, and unplanned capital work.
814 S 19th St sits on the 800 block of S 19th St. Open the block report to compare its parcels, ownership and public-record history.
See the whole block →Next door: 812 S 19th St · 816 S 19th St
This report was assembled Jul 10, 2026, 11:42 PM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.
Official city record ↗ · L&I history ↗ · See the whole block · Download this record (JSON)