Property report

60 N 36th St

Vacant lot · Drexel University · fully tax-exempt (2026 OPA). On the 0 block of N 36th St.

Street view of 60 N 36th St
From the street — imagery © Google
From above · selected parcel outlined; choose a neighboring polygon to open it — imagery © Esri, Maxar
BlockReport AI · cited public records

Ask what this property record means.

Open the research chat with this property already in context. Curated questions are free.

Opens the research chat · 3 custom questions per browser

Property summary

“Open” reflects records available then historical records keep their source dates estimates are labeled

Question or correct this record

BlockReport can explain a discrepancy, but it cannot rewrite an official City record. Use the agency that owns the underlying fact:

The estimate, live balance, and back-tax record are different.

BlockReport can calculate the annual tax from the City’s taxable assessment. Payments, credits, interest, and a current amount due live separately in Philadelphia Tax Center.

Estimated annual Real Estate Tax$0/year

2026 taxable assessment $0 × 1.3998%. Estimate—not a bill or account balance.

OPA also publishes a 2027 assessment of $109,305,800; it is not the 2026 billed-year value.

Official current account balanceCheck live

A Tax Center balance is net of bills, payments, credits, interest, and adjustments. A credit—or an amount due—is not automatically “back taxes.”

OPA 773592200
Open Philadelphia Tax Center →Choose “View period balance” to see the tax year and any credit, interest, or delinquency.
Exemption classificationFull assessment exemption shown

2026 OPA shows a zero or de minimis taxable assessment. The open assessment split does not establish the exemption's legal basis, continuing eligibility, or treatment after a transfer.

Historical delinquency sources No current conclusion

This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.

For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”

What stands out

From the public record

The property record, over time

Every dated deed, permit, inspection, license, violation, certification, and appeal is placed on the City’s annual assessment line. Select a point to read what happened; the line is an assessment history—not a sale-price chart or appraisal. OPA has also published a 2027 assessment of $109,305,800; it is not yet the billed-year tax basis.

Assessment history · all dated City records marked on the line

$0$100M$200M$109M20202022202420262027
Property assessmentAssessmentL&I violationPermitInspectionLicenseCertification

Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.

Highlight
Every dated record39 events · exact dates, newest first
  1. CertificationSprinkler Certification
  2. CertificationEmergency and Standby Power Systems Certification
  3. LicenseFood Preparing and Serving (30+ SEATS)
  4. CertificationSprinkler Certification
  5. CertificationFire Alarm Certification
  6. InspectionL&I investigation
  7. LicenseHigh Rise
  8. L&I violationPERIODIC TESTING
  9. L&I violationINSPECTION, TESTING & MAINTENANCE
  10. L&I violationHAZARD IDENTIFICATION SIGNS
  11. L&I violationEQUIPMENT ROOMS
  12. L&I violationFIRE RESISTANCE RATED CONSTRUCTION
  13. L&I violationSAFETY DATA SHEETS
  14. InspectionL&I investigation
  15. L&I violationHIGH-RISE BUILDING
  16. L&I violationINSPECTION, TESTING & MAINTENANCE
  17. L&I violationFDC LOCKING CAPS
  18. CertificationFire Alarm Certification
  19. CertificationSprinkler Certification
  20. PermitAddition and/or Alterations
  21. L&I violationOCCUPIED W/O FINAL APPROVAL
  22. PermitAddition and/or Alteration
  23. PermitAlterations
  24. PermitAddition and/or Alterations
  25. PermitNew Construction
  26. InspectionL&I investigation
  27. L&I violationCERTIFICATION
  28. L&I violationEMERGENCY DRILL RECORD CONTENT
  29. L&I violationEVACUATION PLAN CONTENT
  30. L&I violationFIREBLOCKING/DRAFTSTOPPING
  31. PermitAddition and/or Alteration
  32. PermitRough-In
  33. PermitNew Construction or Additions
  34. PermitSign
  35. PermitAddition and/or Alterations
  36. PermitTower Crane
  37. PermitNew Construction
  38. PermitNew Construction (Shell Only)
  39. PermitFoundation
Not a houseProperty report

This is a vacant lot, not a home, and OPA shows a full or near-full assessment exemption whose basis must be verified. A $0 assessment-based tax estimate does not prove the live Tax Center account has no prior-period balance or other charges. Homeowner investment tools are hidden; the assembled public-source record remains below.

What it is
Vacant lot
Vacant Land Commer Acre+
Owner
Drexel University
Public / institutional
OPA tax treatment
Full assessment exemption shown
2026 OPA taxable assessment $0 · basis and live balance require separate verification
Assessed value
$109,305,800
2026 OPA · 2027: $109,305,800
Zoning
CMX4

Browse the source ledger

The chart above is the primary timeline. This drawer preserves every underlying dated row and its filed status for source-level review.

Open the City record ↗
Browse 57 dated records deeds, permits, inspections, licenses, violations, certifications & appeals
  1. CertificationSprinkler Certification

    Certification BC-2026-017605 · Certified

    Expires 2027-06-18

  2. CertificationEmergency and Standby Power Systems Certification

    Certification BC-2026-015140 · Certified

    Expires 2027-05-28

  3. LicenseFood Preparing and Serving (30+ SEATS)

    License 1007941 · Active

    Saxbys, PBC (Saxbys Drexel HSB) · Expires 2027-05-18

  4. CertificationSprinkler Certification

    Certification BC-2025-017279 · Certified

    Expires 2026-06-25

  5. CertificationFire Alarm Certification

    Certification BC-2024-025726 · Certified

    Expires 2025-08-28

  6. InvestigationL&I investigation

    Case CF-2023-117293 · PASSED

    The cited inspection visit was marked passed.

  7. InvestigationL&I investigation

    Case CF-2024-024656 · PASSED

    The cited inspection visit was marked passed.

  8. InvestigationL&I investigation

    Case CF-2024-024656 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  9. LicenseHigh Rise

    License 947747 · Active

    Drexel University (Drexel University) · Expires 2027-03-26

  10. ViolationPERIODIC TESTING

    Case CF-2024-024656 · Violation VI-2024-020172 · Code F-901.6.4 · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  11. ViolationINSPECTION, TESTING & MAINTENANCE

    Case CF-2024-024656 · Violation VI-2024-020173 · Code F-901.6 · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  12. ViolationHAZARD IDENTIFICATION SIGNS

    Case CF-2024-024656 · Violation VI-2024-020174 · Code F-5003.5 · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  13. ViolationEQUIPMENT ROOMS

    Case CF-2024-024656 · Violation VI-2024-020175 · Code F-315.3.3 · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  14. ViolationFIRE RESISTANCE RATED CONSTRUCTION

    Case CF-2024-024656 · Violation VI-2024-020176 · Code F-701.2 · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  15. ViolationSAFETY DATA SHEETS

    Case CF-2024-024656 · Violation VI-2024-020177 · Code F-407.2 · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  16. InvestigationL&I investigation

    Case CF-2023-098378 · PASSED

    The cited inspection visit was marked passed.

  17. InvestigationL&I investigation

    Case CF-2023-117293 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  18. ViolationHIGH-RISE BUILDING

    Case CF-2023-117293 · Violation VI-2023-088514 · Code F-105.6.3 · COMPLIED

    Resolution: COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  19. InvestigationL&I investigation

    Case CF-2023-098378 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  20. ViolationINSPECTION, TESTING & MAINTENANCE

    Case CF-2023-098378 · Violation VI-2023-072686 · Code F-901.6 · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  21. ViolationFDC LOCKING CAPS

    Case CF-2023-098378 · Violation VI-2023-072687 · Code F-912.4.1 · COMPLIED

    Resolution: COMPLIED - OWNER REPAIR City marked this violation complied with; check the resolution date and live case for what was accepted.

  22. InvestigationL&I investigation

    Case CF-2021-061053 · PASSED

    The cited inspection visit was marked passed.

  23. CertificationFire Alarm Certification

    Certification BC-2024-012092 · Certified

    Expires 2024-06-27

  24. CertificationSprinkler Certification

    Certification BC-2023-017584 · Certified

    Expires 2024-06-21

  25. CertificationSprinkler Certification

    Certification BC-2023-013601 · Deficient

  26. InvestigationL&I investigation

    Case CF-2023-016913 · PASSED

    The cited inspection visit was marked passed.

  27. PermitAddition and/or Alterations

    Permit FP-2023-000532 · Completed

    EZ PERMIT SPRINKLER RELOCATION (NFPA 13)- For the Relocation of Sprinkler Heads as per attached standards. Deviations from these standards require submission of construction and site plans. Relocate 2 Sprinkler Heads

  28. ViolationOCCUPIED W/O FINAL APPROVAL

    Case CF-2023-016913 · Violation VI-2023-012737 · Code A-402.5 · COMPLIED

    Resolution: COMPLIED - LICENSE/CERTIFICATE/REPORT OBTAINED City marked this violation complied with; check the resolution date and live case for what was accepted.

  29. InvestigationL&I investigation

    Case CF-2023-016913 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  30. PermitAddition and/or Alteration

    Permit EP-2022-011477 · Completed

    REWORK AND REUSE EXISTING PANELS. INSTALL NEW TRANSFORMER. INSTALL NEW LIGHT FIXTURES, RECEPTACLES AND DEVICES. POWER CONNECTIONS TO HVAC/MACH/PLUM. EQUIPMENT. EMPTY BOX AND STUB UP FOR TELE/DATA, AV, AND SECURITY. INSTALL NEW FA DECIVES AND CONNECT TO EXISTING SYSTEM AS PER 2017 NEC AND 2016 NFPA 72.

  31. PermitAlterations

    Permit PP-2022-013925 · Completed

    INSTALL 1 MOP SINK, 2 HAND SINKS, 3 FLOOR SINKS, 1 GREASE INTERCEPTOR, 1 FLOOR DRAIN, 1 3-COMPARTMENT SINK, 1 HOT WATER HEATER AND 7 BACKFLOW PREVENTERS ACCORDING TO THE 2018 PPC.

  32. PermitAddition and/or Alteration

    Permit CP-2022-003666 · Completed

    FOR LEVEL II ALTERATIONS TO AN EXISTING TENANT SPACE ON THE GROUND FLOOR LEVEL OF AN EXISTING STRUCTURE. FOR USE AS A BUSINESS OCCUPANCY. ALTERATIONS TO INCLUDE THE ERECTION OF PARTITION WALLS, PROVIDE FINISHES/FURNISHINGS, AND ACCESSIBILITY IMPROVEMENTS THROUGHOUT. BUILDING TO BE FULLY SPRINKLERED. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN PROFESSIONAL PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS TO BE OBTAINED FOR ALL OTHER WORK.

  33. PermitAddition and/or Alteration

    Permit EP-2022-001322 · Completed

    1. Cabling (24 strand SM fiber optic cable) Telecom Demarc 1M-07 to IDF1-09 Include 24 Strand Armored Plenum Rated SM Fiber 48 LC Anaerobic Connectors 2 One RU Optical Shelves with each with two LC 12 port Coupler panels. 2. Cabling (50-pair copper backbone UTP) Telecom Demarc 1M-07 to IDF1-09 Includes 50 Pair CMP Rated category 3 copper Include 48 port category 5 patch panels installed 3. STI EZ-Path (4) 4" Floor Sleeves (IDF 2-10 through IDF 12-10 plus PH) Install 12 units of 4-way frames and 48 4” EZ Path Sleeves Work scope references EZ Path – Plans reference Hilti Sleeves fr floor – an OPTIONAL Deduct is provided if Hilti Sleeves are usable for the floor 4. Cable tray & wire management / racks as shown Typical IDF Room Layout (IDF 2-10 through IDF 12-10) Includes 12” x 4” Deep ladder tray All wall and ceiling mounting hardware for cable runway 11 x 7’ freestanding racks with 2 vertical wire managers to each rack 5. Cable tray & wire management / Cabinets and racks as shown for MDF Room Layout 6. Cabling (24 strand SM fiber optic cable) IDF1-09 to each IDF 2-10 through 12-10 plus PH Include 24 Strand Armored Plenum Rated SM Fiber to 12 locations 576 LC Anaerobic Connectors 12 One RU Optical Shelves with each with two LC 12 port Coupler panels 2 x 4RU Optical Enclosures each with 12 LC Coupler Panels 7. Cabling (50-pair copper backbone UTP) IDF1-09 to each IDF 2-10 through 12-10 plus PH Includes 12 runs of 50 pair category 3 CMP rated cable Includes 24 category 5 48 port copper patch panels (This copper termination configuration is the costliest – customer may require a different termination method- saving may be realized if that is the case) 8. Fiber enclosures with panels & connectors to terminate cables (IDF 1-09, IDF 2-10 through IDF 12-10 plus PH) Costs for this work are included in the Internal Backbone Pricing Provided. 9. Communications IDF Room Copper Grounding conductors & busbars. Costs are covered under the Communication Roo

  34. PermitAddition and/or Alterations

    Permit FP-2022-000504 · Completed

    RELOCATE 78 HEADS See CP-2021-001047

  35. PermitAddition and/or Alteration

    Permit EP-2022-000386 · Completed

    Provide and install sixty-two (62) single Category 6 wall phone locations. ?Provide and install ninety-seven (97) ceiling mount triple Category 6 CCTV locations. ?Provide and install one hundred ninety-nine (199) ceiling mount triple Category 6 locations. ?Provide and install three hundred eighty-two (382) surface mount dual Category 6A wireless access pointlocations. ?Provide labor to install three hundred eighty-two (382) customer-provided wireless access points. ?Provide and install ninety-eight (98) floor mount triple Category 6 locations. ?Provide and install one thousand two hundred fifty-seven (1,257) flush mount triple Category 6 locations. ?Provide and install Siemon faceplates, surface mount boxes, floor frames and modular jacks as requiredfor termination of the 4-pair cables at the workstation location. ?Provide and install one hundred seventy-seven (177) Siemon 48-port flat patch panels, each loaded withZ-Max Category 6 modular jacks. These will be installed at the required closet location for termination ofthe Category 6 cables installed. ?Provide and install twenty-one (21) Siemon 48-port flat modular patch panels, each loaded with therequired Z-Max Category 6A modular jacks. These will be installed at the required closet location fortermination of the Category 6A wireless access point cables installed. Provide and install seven (7) 9-cable AV bundles. ?Provide and install thirty-two (32) 18-cable AV bundles. ?Provide and install two (2) 48-cable AV bundles. ?Provide and install eighteen (18) Siemon 48-port flat patch panels, each loaded with Z-Max Category 6modular jacks. These will be installed at the required closet location for termination of the Category 6cables installed. Provide and install one (1) General Category 3 plenum rated 25-pair cable from the Ground Floor MDF toeach of the following locations: ?2nd Floor East IDF ?2nd Floor West IDF ?4th Floor East IDF ?4th Floor West IDF ?6th Floor East IDF ?6th Floor West IDF ?

  36. PermitNew Construction

    Permit MP-2021-001086 · Completed

    FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK FOR CORE AND SHELL. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT THE DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS ARE REQUIRED FOR ALL OTHER WORK. **SYSTEM COMMISSIONING IS REQUIRED**

  37. InvestigationL&I investigation

    Case CF-2021-061053 · FAILED

    The cited inspection visit was marked failed; later rows may show follow-up or resolution.

  38. ViolationCERTIFICATION

    Case CF-2021-061053 · Violation VI-2021-043745 · Code FC-13-915 · CLOSED

    Resolution: CLOSED - REISSUED/REWRITTEN City marked the record closed; open the case for the closing reason.

  39. ViolationEMERGENCY DRILL RECORD CONTENT

    Case CF-2021-061053 · Violation VI-2021-043746 · Code FC-13-405 · CLOSED

    Resolution: CLOSED - REISSUED/REWRITTEN City marked the record closed; open the case for the closing reason.

  40. ViolationEVACUATION PLAN CONTENT

    Case CF-2021-061053 · Violation VI-2021-043747 · Code FC-13-404.3 · CLOSED

    Resolution: CLOSED - REISSUED/REWRITTEN City marked the record closed; open the case for the closing reason.

  41. ViolationFIREBLOCKING/DRAFTSTOPPING

    Case CF-2021-061053 · Violation VI-2021-043748 · Code FC-13-703.1.1 · CLOSED

    Resolution: CLOSED - REISSUED/REWRITTEN City marked the record closed; open the case for the closing reason.

  42. PermitAddition and/or Alteration

    Permit EP-2021-005180 · Completed

    ELECTRICAL WITH FIRE ALARM, TEMP LIGHTING AND POWER, REWORK AND REUSE EXISTING PANES.INSTALL NEW LIGHT FIXTURES, RECEPTACLES AND DEVICES. POWER CONNECTIONS TO HVAC/MECHANICAL EQUIPMENT. EMPTY BOX AND STUB UP FOR TELE DATA. AU AND SECURITY INSTALL NEW FA DEVICES AND CONNECT TO EXISTING SYSTEM. AS PER THE 2017 NEC & 2016 NFPA-72.

  43. PermitRough-In

    Permit EP-2021-005181 · Expired

    ELECTRICAL WITH FIRE ALARM, TEMP LIGHTING AND POWER, REWORK AND REUSE EXISTING PANES.INSTALL NEW LIGHT FIXTURES, RECEPTACLES AND DEVICES. POWER CONNECTIONS TO HVAC/MECHANICAL EQUIPMENT. EMPTY BOX AND STUB UP FOR TELE DATA. AU AND SECURITY INSTALL NEW FA DEVICES AND CONNECT TO EXISTING SYSTEM.

  44. PermitNew Construction or Additions

    Permit PP-2021-003962 · Completed

    Plumbing Fitout that includes; domestic water, lab water, sanitary, lab waste, medical gas.

  45. PermitNew Construction

    Permit EP-2020-011552 · Completed

    Provide new fire alarm system including all panels, speakers, speaker strobes, strobes, pull stations, detectors, ALL WORK DONE ACCORDING TO APPROVED DRAWINGS-2107 NEC and 2016 NFPA-72.

  46. PermitNew Construction or Additions

    Permit PP-2021-006370 · Completed

    To install 6 trench drains at various locations. To install 13 cleanouts at various locations on storm detention basin. To install 3 catch basins at various locations. To install 1 (16 in) ductile iron lateral complete with 15 in curbtrap and fresh air inlet for storm detention basin. To install 2 (6 in) sanitary laterals and house traps with fresh air inlets up to 5 ft of foundation wall. To install 2 (8 in) sanitary laterals and house traps with fresh air inlets up to 5 ft of foundation wall. To install 1 (6in) storm lateral and house trap with fresh air inlet up to 5 ft of foundation wall.

  47. PermitNew Construction or Additions

    Permit PP-2020-009865 · Completed

    Core and Shell Work 1) Install underground storm, sanitary and domestic water piping 2) Install above ground storm piping, sanitary piping, domestic water piping, floor & roof drains, domestic water booster pump, electric water heaters and fixtures.

  48. PermitAddition and/or Alteration

    Permit CP-2021-001047 · Completed

    Fit out for a high-rise structure to create an educational facility with business and professional offices as per approved plans. Work to include structural work as well. See permit CP-2020-003474 for core/shell permit.

  49. PermitSign

    Permit GP-2021-000591 · Completed

    FOR THE INSTALLATION OF FIVE (5) NON-ILLUMINATED FLAT WALL SIGNS TO INCLUDE FOUR (4) ACCESSORY SIGNS AND ONE (1) ADDRESS NUMERALS SIGN AS PER APPROVED PLANS. SIGNS ACCESSORY TO EDUCATIONAL FACILITY. SIGNS PERMIT ONLY.

  50. PermitNew Construction

    Permit FP-2021-000099 · Completed

    COMBINED AUTOMATIC SPRINKLER & CLASS I MANUAL WET STANDPIPE SYSTEMS WITH (6) INCH FIRE SERVICE LINE & BACKFLOW PREVENTION (BFP) ASSEMBLY TO SERVE PREVIOUSLY APPROVED HIGH-RISE OFFICE/LAB BUILDING. AUTOMATIC SPRINKLER SYSTEM & STANDPIPE SYSTME INSTALLATION PER NFPA 13/14.

  51. PermitAddition and/or Alterations

    Permit FP-2020-002487 · Completed

    EZ STANDARD KITCHEN FIRE SUPPRESSION- For the installation of New Wet Chemical Kitchen Fire Suppression System as per attached standard. Deviations from these standards require submission of construction and site plans. (MP-2020-006344)

  52. PermitAddition and/or Alterations

    Permit MP-2020-006344 · Completed

    FOR THE INSTALLATION OF COMMERCIAL KITCHEN EXHAUST HOODS AS PER PLANS.

  53. PermitNew Construction

    Permit EP-2020-005483 · Completed

    INSTALL ELECTRICAL SERVICE AS SHOWN ON THE SINGLE LINE. PROVIDE TEMP LIGHTING AND POWER. PROVIDE LIGHTNING PROTECTION AND GROUNDING LOOP. INSTALL LIGHT FIXTURES, LIGHTING CONTROLS, AND RECEPTACLES. GENERATOR INSTALLATION. PROVIDE INCOMING TELECOM CONDUIT AND RACEWAYS. PROVIDE POWER FOR HVAC/ MECHANICAL, & PLUMBING EQUIPMENT AS PER 2017 NEC.

  54. PermitTower Crane

    Permit GP-2020-008080 · Expired

    FOR THE ERECTION, OPERATION AND DIS-ASSEMBLY OF TWO (2) TOWER CRANES AS PART OF A HIGH-RISE CONSTRUCTION PROJECT.

  55. PermitNew Construction

    Permit EP-2020-005589 · Completed

    Site Temporary Power wiring and lighting

  56. PermitNew Construction (Shell Only)

    Permit CP-2020-003474 · Completed

    FOR THE CORE/SHELL CONSTRUCTION OF A FOURTEEN (14) STORY SEMI-DETACHED STRUCTURE AS PER APPROVED PLANS. SIZE AND LOCATION AS SHOWN ON PLANS. NO OTHER WORK THIS PERMIT. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.

  57. PermitFoundation

    Permit SP-2020-000086 · Expired

    For exterior work only, for the excavation and installation of a temporary support of excavation system. This scope of this permit does not include the installation of foundations or building construction. Amended as of 10/21/2020 for modification of the previously method of support of excavation from soldier beam and lagging to shotcrete and soil nail due to site constraints.**separate permit required for any foundation permits **

What this record suggests

The City file documents 24 permits touching kitchen work, electrical work, plumbing, roof work. 21 carries a completed, issued, or approved status; that documents the filing, not the present quality of the work.

Block context

60 N 36th St sits on the 0 block of N 36th St. Open the block report to compare its parcels, ownership and public-record history.

See the whole block →

Where this comes from

Methodology & freshness

This report was assembled Jul 11, 2026, 3:17 AM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.

Official city record ↗  ·  L&I history ↗  ·  See the whole block  ·  Download this record (JSON)