2026 taxable assessment $3,073,300 × 1.3998%. Estimate—not a bill or account balance.
OPA also publishes a 2027 assessment of $4,343,000; it is not the 2026 billed-year value.
Industrial property report
3,150 sqft · RSD3 · built 1970
Industrial · Capital Cities & Broadcasting Corp · assessed $3.1M (2026) · 2027 OPA assessment $4.3M. On the 400 block of Wigard Ave.

Open the research chat with this property already in context. Curated questions are free.
“Open” reflects records available then historical records keep their source dates estimates are labeled
BlockReport can explain a discrepancy, but it cannot rewrite an official City record. Use the agency that owns the underlying fact:
Property tax
BlockReport can calculate the annual tax from the City’s taxable assessment. Payments, credits, interest, and a current amount due live separately in Philadelphia Tax Center.
2026 taxable assessment $3,073,300 × 1.3998%. Estimate—not a bill or account balance.
OPA also publishes a 2027 assessment of $4,343,000; it is not the 2026 billed-year value.
A Tax Center balance is net of bills, payments, credits, interest, and adjustments. A credit—or an amount due—is not automatically “back taxes.”
OPA 8846300502026 taxable assessment equals the full assessed value.
This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.
For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”
built new under a 2018 permit.
View supporting records →Every dated deed, permit, inspection, license, violation, certification, and appeal is placed on the City’s annual assessment line. Select a point to read what happened; the line is an assessment history—not a sale-price chart or appraisal. OPA has also published a 2027 assessment of $4,343,000; it is not yet the billed-year tax basis.
Assessment history · all dated City records marked on the line
Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.
This is a industrial, recorded under the city's industrial category. The homeowner tools (rent estimate, homestead playbook) don't apply, so they're hidden. The full record and owner trail are below.
Records behind the chart
The chart above is the primary timeline. This drawer preserves every underlying dated row and its filed status for source-level review.
Certification BC-2026-018166 · Certified
Expires 2027-06-12
Certification BC-2025-032592 · Certified
Expires 2026-12-02
Certification BC-2025-015716 · Certified
Expires 2026-06-05
Certification BC-2025-011698 · Certified
Expires 2026-03-10
Certification BC-2025-011699 · Certified
Expires 2026-03-10
Certification BC-2025-000723 · Certified
Expires 2025-12-12
Certification BC-2024-019471 · Certified
Expires 2025-06-14
Certification BC-2024-032416 · Certified
Expires 2025-03-27
Certification BC-2023-025667 · Certified
Expires 2024-12-08
Certification BC-2023-012132 · Certified
Expires 2024-05-30
Certification BC-2022-018815 · Certified
Expires 2023-12-07
Case CF-2022-059487 · PASSED
The cited inspection visit was marked passed.
Certification BC-2022-011845 · Certified
Expires 2023-08-12
Case CF-2022-059487 · Violation VI-2022-044458 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
Case CF-2022-059487 · Violation VI-2022-044442 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
Case CF-2022-059487 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
Certification BC-2022-008081 · Deficient
Permit SP-2021-000520 · Completed
FOR THE INSTALLATION OF AN EXTERIOR CONCRETE PAD. **EXTERIOR WORK ONLY**
Permit EP-2021-008557 · Completed
Remove (2) existing 15kv air switches and install (2) new 15kv air switches replace in kind with no additional wiring. These are associated to PECO utility line #131 & 2611. No additional loads will be added. As per 2017 NEC.
Permit GP-2021-009077 · Expired
FOR THE REPLACEMENT OF AN EXISTING ANTENNA WITH A NEW ANTENNA. INSTALLATION TO BE PERFORMED PER APPROVED PLANS.
Permit GP-2021-006680 · Completed
TANK REMOVAL PERMIT - REMOVAL OF ONE 1,000 GALLON HEATING OIL UNDERGROUND STORAGE TANK (UST) REMOVE ANY PETROLEUM PRODUCT/WATER FROM TANK, CLEAN TANK, CONDUCT A CONFIRMATORY SOIL SAMPLING OF SURROUNDING SOIL. CONTINGENCY PLAN IN PLACE IN THE CASE CONTAMINATED SOILS DISCOVERED AND BACKFILL. ALL WORK COMPLETED IN ACCORDANCE WITH PADEP UST REMOVAL GUIDELINES. PROVIDE THE CITY OF PHILADELPHIA WITH A TANK CLOSURE REPORT.
Permit 957290 · Issued
INSTALL NEW LIGHTING. INSTALL 2 NEW 500KVA TRANSFORMERS. INSTALL NEW SWITCHGEAR 208/120VOLT AMPS. REFEED EXISTING EQUIPMENT AS NEEDED. INSTALL 500KW GENERATOR. INSTALL NEW PANELS AND FEEDS TO NEW TRANSMITTER EQUIPMENT. PER 'O8 NEC. INSTALL COMPLETE FIRE ALARM SYSTEM PER ENGINEER SEALED, CITY APPROVED DRAWINGS. PER NFPA-72.
Permit 961595 · COMPLETED
INSTALLATION OF NEW HVAC SYSTEM THROUGHOUT AN INTERIM TRANSMISSION FACILITY AS PER APPROVED PLANS.
Permit 960705 · COMPLETED
FOR THE INSTALLATION OF A NFPA 2001 FIRE SUPPRESSION SYSTEM IN A TRAMSMISSION FACILITY. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. FIRE SUPPRESSION SYSTEM TO BE INSTALLED IN ACCORDANCE WITH NFPA 2001 STANDARD. **SEPARATE PERMITS REQUIRED FOR AN ELECTRICAL WORK**
Permit 948362 · COMPLETED
ALTERATIONS, TO INCLUDE, INTERIOR RENOVATIONS, NEW ROOFING SYSTEM AND NEW CONCRETE PADS AS PER APPROVED PLANS. ASBESTOS REMEDIATION REQUIRED PRIOR TO START OF WORK SEPARATE PERMITS REQUIRED FOR MEP WORK.
Permit 939734 · Expired
EZ INTERIOR DEMOLITION- For the interior demolition on non-bearing partition wall and ceilings as per attached standard. Deviations from these standards require submission of construction and site plans
Permit 846850 · COMPLETED
FOR THE INSTALLATION OF A 12 FT. X 12 FT. CONCRETE PAD ALONG THE EASTERN WALL OF AN EXISTING SINGLE-STORY DETACHED STRUCTURE AS PART OF AN EXISTING TELECOMMUNICATIONS SITE, AS PER PLANS; NO OTHER WORK ON THIS PERMIT.
Permit 846746 · COMPLETED
WIRE (1) 75KVA TRANSFORMERS (2) 60AMP CIRCUITS TO NEW TRANSMITTER WIRE EXTERNAL PUP PACKAGE (2) HEAT EXCHAGES & 4 110V TWISTLOCK REGISTERS INSTALL GROUND BLOCK.AS PER 2008 NEC.(NORTH DISTRICT)
Case 188776 · PASSED
The cited inspection visit was marked passed.
Case 188776 · FAILED
The cited inspection visit was marked failed; later rows may show follow-up or resolution.
Case 188776 · Violation 1255917 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
Case 188776 · Violation 1255918 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
Case 188776 · Violation 1255916 · COMPLIED
City marked this violation complied with; check the resolution date and live case for what was accepted.
What this record suggests
The City file documents 11 permits touching electrical work, roof work. 9 carries a completed, issued, or approved status; that documents the filing, not the present quality of the work.
Capital Cities & Broadcasting Corp · corporate / LLC owner
• Owns 2 properties across Philadelphia under this name, assessed at $12M combined
• Tax bills mail to 4100 City Line Ave, Philadelphia PA, 19131
431 Wigard Ave sits on the 400 block of Wigard Ave. Open the block report to compare its parcels, ownership and public-record history.
See the whole block →Next door: 437 Wigard Ave · 439-41 Wigard Ave
This report was assembled Jul 10, 2026, 9:59 AM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.
Official city record ↗ · L&I history ↗ · See the whole block · Download this record (JSON)