2026 taxable assessment $125,000 × 1.3998%. Estimate—not a bill or account balance.
OPA also publishes a 2027 assessment of $119,100; it is not the 2026 billed-year value.
Land report
Apartment building · Pema Construction LLC · assessed $125K (2026) · 2027 OPA assessment $119K. On the 300 block of Wright St.

Open the research chat with this property already in context. Curated questions are free.
“Open” reflects records available then historical records keep their source dates estimates are labeled
BlockReport can explain a discrepancy, but it cannot rewrite an official City record. Use the agency that owns the underlying fact:
Property tax
BlockReport can calculate the annual tax from the City’s taxable assessment. Payments, credits, interest, and a current amount due live separately in Philadelphia Tax Center.
2026 taxable assessment $125,000 × 1.3998%. Estimate—not a bill or account balance.
OPA also publishes a 2027 assessment of $119,100; it is not the 2026 billed-year value.
A Tax Center balance is net of bills, payments, credits, interest, and adjustments. A credit—or an amount due—is not automatically “back taxes.”
OPA 2110000182026 taxable assessment equals the full assessed value.
This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.
For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”
built new under a 2021 permit, sold for $375K in 2024.
View supporting records →Assessed at $119K, but it traded for $375,000 in 2024 — a 3.1× gap. Could be a non-market deed the record doesn't label, or an assessment that hasn't caught up.
View supporting records →Every dated deed, permit, inspection, license, violation, certification, and appeal is placed on the City’s annual assessment line. Select a point to read what happened; the line is an assessment history—not a sale-price chart or appraisal. OPA has also published a 2027 assessment of $119,100; it is not yet the billed-year tax basis.
Assessment history · all dated City records marked on the line
Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.
An empty lot: no building, just the land and its paper trail. The homeowner tools don't apply; the deed history, owner and zoning are below, and the analyst can trace what the owner holds citywide.
Records behind the chart
The chart above is the primary timeline. This drawer preserves every underlying dated row and its filed status for source-level review.
Permit EP-2021-015469 · Issued
Electrical Permit for combo RP-2021-018933
Permit FP-2025-000027 · Issued
FOR THE INSTALLATION OF A NFPA 13R SYSTEM FOR A SINGLE-FAMILY DWELLING SERVICED BY A TWO (2) INCH FIRE SERVICE LINE WITH A 2-INCH WILKINS 950XLT2 BACKFLOW PREVENTER AND AUTOMATIC FIRE SUPPRESSION SYSTEM. ALL WORK SHALL BE DONE IN ACCORDANCE WITH APPROVED PLANS/HYDRAULIC CALCULATIONS.
Permit MP-2021-008896 · Issued
Mechanical / Fuel Gas Permit for combo RP-2021-018933
Permit PP-2021-024933 · Completed
Plumbing Permit (Water Distribution) for combo RP-2021-018933
Permit PP-2021-024935 · Issued
Plumbing Permit (Interior) for combo RP-2021-018933
Permit PP-2021-024934 · Completed
Plumbing Permit (Exterior Building Drainage) for combo RP-2021-018933
2024
Appeal ZP-2022-002284 · Completed · Granted
Related permit ZP-2022-002284 · Permit for erection of a semi-detached structure with roof deck, rear deck and front porch to use as single family household living with one accessory interior off-street parking space accessed by a shared drive way from gates street (size
Permit ZP-2022-002284 · Issued
Erection of a semi-detached structure with roof deck, rear deck and front porch to use as single family household living with one accessory interior off-street parking space accessed by a shared drive way from gates street (size and location as show on the plan). Note: construction design and materials shall comply zoning code section 14-504 (8) (c).
Permit RP-2021-018933 · Issued
ERECTION OF A STRUCTURE FOR USE AS SINGLE FAMILY HOUSEHOLD LIVING. SHEETING AND SHORING AS PRESCRIBED IN GEO TECH REPORT. SEPARATE PERMITS REQUIRED FOR ELECTRICAL, MECHANICAL, PLUMBING AND SPRINKLER (13R) WORK. (NO UNDERPINNING ON THIS PERMIT). ENERGY CODE COMPLIANCE IN ACCORDANCE WITH 2015 IECC. PRIOR TO ISSUANCE OF C.O SUBMITTAL OF AIR BARRIER CHECKLIST AND ENVELOPE TESTING CERTIFICATE IS REQUIRED. BOTH TO BE COMPLETED BY AN APPROVED PARTY.**AMENDED 6/27/23-Amendments include the following: Side yard setback changed to 5', Work in steep slope to include removal of existing retaining wall and rebuilding at new lower level per elevations. ,Removed 3rd floor setback Roof deck has partial roof extended from pilot house.**AMENDED 7/21/25- Amended to change joist to TGI as per bubbled plan. NO OTHER CHANGES APPROVED ON THIS PERMIT**
Permit ZP-2021-015336 · Issued
FOR THE ERECTION OF A SEMI-DETACHED STRUCTURE; FOR USE AS A SINGLE-FAMILY HOUSEHOLD LIVING WITH ONE (1) ACCESSORY INTERIOR OFF-STREET PARKING SPACE; SIZE AND LOCATION AS SHOWN IN THE APPLICATION/PLAN.
What this record suggests
The City file documents 9 permits touching electrical work, plumbing, roof work. 9 carries a completed, issued, or approved status; that documents the filing, not the present quality of the work.
Places where the city's own paperwork disagrees with itself. These are flags on the data — not problems with the property.
Assessed at $119K, but it traded for $375,000 in 2024 — a 3.1× gap. Could be a non-market deed the record doesn't label, or an assessment that hasn't caught up.
322 Wright St sits on the 300 block of Wright St. Open the block report to compare its parcels, ownership and public-record history.
See the whole block →Next door: 320 Wright St · 324 Wright St
This report was assembled Jul 10, 2026, 6:55 AM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.
Official city record ↗ · L&I history ↗ · See the whole block · Download this record (JSON)