2026 taxable assessment $317,720 × 1.3998%. Estimate—not a bill or account balance.
OPA also publishes a 2027 assessment of $977,600; it is not the 2026 billed-year value.
Apartment building report
5 stories · 249,660 sqft · CMX4 · built 2023
Apartments · 800 Vine Senior Housing LLC & Authority · assessed $978K (2026) · 2027 OPA assessment $978K. On the 200 block of N 9th St.

Open the research chat with this property already in context. Curated questions are free.
“Open” reflects records available then historical records keep their source dates estimates are labeled
BlockReport can explain a discrepancy, but it cannot rewrite an official City record. Use the agency that owns the underlying fact:
Property tax
BlockReport can calculate the annual tax from the City’s taxable assessment. Payments, credits, interest, and a current amount due live separately in Philadelphia Tax Center.
2026 taxable assessment $317,720 × 1.3998%. Estimate—not a bill or account balance.
OPA also publishes a 2027 assessment of $977,600; it is not the 2026 billed-year value.
A Tax Center balance is net of bills, payments, credits, interest, and adjustments. A credit—or an amount due—is not automatically “back taxes.”
OPA 8810004362026 OPA taxes $317,720 of $977,600 assessed. The assessment fields alone do not identify a program, approval date, expiration, or buyer eligibility.
See the assessment math →Applying the same rate to the billed-year full assessment. OPA's numeric split does not say when or whether the current treatment changes.
See the assessment math →This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.
For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”
new construction appears in a 2023 permit with a reduced taxable assessment shown.
View supporting records →Every dated deed, permit, inspection, license, violation, certification, and appeal is placed on the City’s annual assessment line. Select a point to read what happened; the line is an assessment history—not a sale-price chart or appraisal. OPA has also published a 2027 assessment of $977,600; it is not yet the billed-year tax basis.
Assessment history · all dated City records marked on the line
Scroll horizontally to move through the years. Each icon sits on its recorded date; records without a day are labeled and centered within their year. Select one to explain the filing.
This is a apartments, recorded under the city's apartments category. The homeowner tools (rent estimate, homestead playbook) don't apply, so they're hidden. The full record and owner trail are below.
Records behind the chart
The chart above is the primary timeline. This drawer preserves every underlying dated row and its filed status for source-level review.
License 0971896 · Inactive
800 Vine Senior Housing LLC · Expires 2026-02-18 · Inactive 2026-04-19
Permit PP-2024-012440 · Completed
Plumbing Permit for combo SP-2024-000863
Permit SP-2024-000863 · Completed
SITEWORK ASSOCIATED WITH NEW CONSTRUCTION BUILDING (SEE CP-2022-005101) TO INCLUDE PARKING AREAS AND UTILITY INSTALLATION AS PER APPROVED PLANS. *2018 IBC REVIEW*
Permit FP-2024-000217 · Completed
TO INSTALL NEW FIRE SUPPRESSION SYSTEM COMPLYING WITH NFPA 13 THROUGHOUT THE BUILDING TO INCLUDE 6" MAIN FIRE SERVICE LINE WITH 4" AMES 2000SS BACKFLOW PREVENTION ASSEMBLY, FIRE PUMP PER NFPA 20 AND FIRE SYSTEM TO INCLUDE THE INSTALLATION OF TWO (2) STANDPIPES IN EXIT STAIRWAYS, STANDPIPES TO BE INTERCONNECTED PER NFPA 14 AS PER APPROVED PLANS. ALL WORK SHALL BE PERFORMED BY A FIRE SUPPRESSION CONTRACTOR LICENSED BY THE CITY OF PHILADELPHIA.
Permit EP-2023-009880 · Completed
INSTALL A 800 AMP/120/208V/ 3 PHASE MDP, (2) 800 AMP 120/208V/ 3 PHASE METER BANKS. INSTALL A 208V/ 3 PHASE SERVICE FOR THE FIRE PUMP. INSTALL A 100 KW GENERATOR & (2) ATS, INSTALL PANELS & FEEDERS. INSTALL WIRING THROUGHOUT THE COMMON AREAS & FIFTY ONE DWELLING UNITS. INSTALL LIGHTS NORMAL & EMERGENCY, SWITCHES, SENSORS, RECEPTACLES & SMOKE ALARMS. PROVIDE POWER FOR THE MECHANICAL, HVAC, & ELEVATOR EQUIPMENT. INSTALL LOW VOLTAGE TELECOM WIRING. INSTALL A NEW FIRE ALARM SYSTEM & TWO-WAY COMMUNICATION SYSTEM. ALL WORK IN ACCORDANCE WITH THE 2017 NEC.
Permit FP-2024-000282 · Completed
Rough-In Permit for FP-2024-000217 Preferred Fire Protection to start at 5' outside building at new 6" fire service (by others) & will provide new automatic wet pipe sprinklers system for new 5 story apartment building. This will include a new fire pump, backflow preventer, fire department connection, fire pump test header, & (950) fire sprinklers. Sprinkler heads are provided for above ceiling combustible spaces on floors 2-5. Manual wet standpipes for both stair towers. Stair #1 will have hose valves only. Stair #2 will be a combination standpipe with hose valves & floor control arrangements at every level.
Permit MP-2023-003401 · Completed
FOR THE INSTALLATION OF REGISTERS, DIFFUSERS, AND APPLIANCES WITH ASSOCIATED DUCTWORK. APPLIANCES TO BE INSTALLED IN ACCORDANCE WITH MANUFACTURER'S SPECIFICATIONS. ALL WORK TO BE DONE PER APPROVED PLANS. IF FIELD CONDITIONS VARY CONTACT DESIGN ENGINEER PRIOR TO THE START OF ANY WORK. SEPARATE PERMITS REQUIRED FOR ALL OTHER WORK.
Permit EP-2023-008035 · Completed
Install 100 amp temporary service for construction site and hook up 1 job trailer AS PER NEC 2017
Permit PP-2023-008364 · Completed
New Build for (50) Units (21) Floor Drains (3) Hose Bibbs (2) Hot Water Heaters (50) Kitchen Sinks (50) Lavs Rough In of Aboveground Piping (50) Showers/Tubs (1) Sump Pump (50) WC/Urinals (1) Lint Trap - OTHER
Permit OP-2023-000183 · Expired
INSTALLING 20X40 CANOPY FRAME TENT as per 2018 Philadelphia Fire Code.
Permit CP-2022-005101 · Completed
NEW CONSTRUCTION OF A FIVE (5) STORY STRUCTURE FOR USE AS FIFTY-ONE (51) DWELLING UNITS [AFFORDABLE SENIOR HOUSING UNITS] WITH ACCESSORY AMENITY SPACES AS PER APPROVED PLANS. BUILDING TO UTILIZE HORIZONTAL SEPARATIONS TO CREATE TWO (2) SEPARATE BUILDINGS WITH TWO (2) DIFFERENT CONSTRUCTION TYPES (1ST FLOOR - TYPE IA AND 2ND THROUGH 5TH FLOORS - TYPE VA). SEPARATE AMENDMENT APPROVAL FOR MANUFACTURER'S TRUSS DRAWINGS PRIOR TO INSTALLATION. BUILDING TO BE FULLY SPRINKLERED PER NFPA 13 AND INCLUDE STANDPIPES PER NFPA 14. FIRE WATCH REQUIRED PER CODE BULLETIN F-2001. *2018 IBC* **SEPARATE PERMITS REQUIRED FOR MEP & FIRE SUPPRESSION WORK**
Appeal ZP-2021-015505 · Completed · Granted
Related permit ZP-2021-015505 · (PERMIT) For the erection of a detached structure, size and location as shown on plan/application. For use as Multi-Family Household Living (Fifty-One (51) Dwelling Units; Affordable Senior Housing units only), with nine (9) accessory surfa
Permit ZP-2021-015505 · Completed
FOR THE ERECTION OF A DETACHED STRUCTURE, SIZE AND LOCATION AS SHOWN ON PLAN/APPLICATION.
Permit ZP-2022-003719 · Cancelled
FOR THE LOT ADJUSTMENT TO CREATE FIVE(5) LOTS "PARCEL "A" PARCEL "B "PARCEL "C" PARCEL "D" AND PARCEL "E" FROM THREE(3) OPA ACCOUNTS ( 212-48 N 8TH ST, 217-53 N 9TH ST AND 819-21 RIDGE AVE) . SIZE AND LOCATION AS SHOWN IN THE APPLICATION.
Permit ZP-2021-010297 · Cancelled
ZP-2021-007621
What this record suggests
The City file documents 13 permits touching kitchen work, electrical work, plumbing. 10 carries a completed, issued, or approved status; that documents the filing, not the present quality of the work.
800 Vine Senior Housing LLC & Authority · corporate / LLC owner
• Tax bills mail to 1301 N 31st St, Philadelphia PA, 19121
217 N 9th St sits on the 200 block of N 9th St. Open the block report to compare its parcels, ownership and public-record history.
See the whole block →Next door: 215 N 9th St · 213 N 9th St
This report was assembled Jul 10, 2026, 4:06 AM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.
Official city record ↗ · L&I history ↗ · See the whole block · Download this record (JSON)