2026 taxable assessment $84,900 × 1.3998%. Estimate—not a bill or account balance.
OPA also publishes a 2027 assessment of $189,100; it is not the 2026 billed-year value.
House report
3 bd · 2 ba · 2 stories · 1,400 sqft · RSA5 · built 1915
Owner-occupied · assessed $185K (2026) · 2027 OPA assessment $189K · sold 3×. On the 1800 block of W Champlost Ave.
“Open” reflects records available then historical records keep their source dates estimates are labeled
These curated questions are free. Choose one to open its cited answer.
BlockReport can explain a discrepancy, but it cannot rewrite an official City record. Use the agency that owns the underlying fact:

Property tax
BlockReport can calculate the annual tax from the City’s taxable assessment. Payments, credits, interest, and a current amount due live separately in Philadelphia Tax Center.
2026 taxable assessment $84,900 × 1.3998%. Estimate—not a bill or account balance.
OPA also publishes a 2027 assessment of $189,100; it is not the 2026 billed-year value.
A Tax Center balance is net of bills, payments, credits, interest, and adjustments. A credit—or an amount due—is not automatically “back taxes.”
OPA 1712038002026 OPA removes $100,000 from the taxable assessment through the owner-occupant exemption.
This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.
For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”
Bought for $65K in 2007, demolition permit in 2017, sold for $179K in 2021 (+175%).
View supporting records →City Property History
Every row successfully fetched for this report is counted below. Dataset availability and matching can differ from the City's interactive file; use the official link for current detail.
Mar 24, 2017 COMPLETED Completed Apr 20, 2017
EZ INTERIOR DEMOLITION- FOR THE INTERIOR DEMOLITION OF NON LOAD-BEARING PARTITION WALLS AND CEILINGS AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS.
Mar 30, 2017 COMPLETED Completed Oct 18, 2017
EZ PERMIT STADARD ALTERATIONS- FOR ALTERATIONS TO AN EXISTING ONE FAMILY DWELLING AS PER ATTACHED STANDARD. DEVIATIONS FROM THIS STANDARD WILL RESULT IN PERMIT REVOCATION AND REQUIRE SUBMISSION OF CONSTRUCTION PLANS
Apr 3, 2017 COMPLETED
REPLACE 100AMP BREAKER PANEL,REWIRE THROUGHOUT OUTLETS,LIGHTS,SWITCHES AND SMOKE/CO DETECTORS PER 2008 NEC (SFD)
Jun 26, 2020 Expired Completed Mar 30, 2023
For minor construction work at the subject property in accordance with all applicable provisions of the Philadelphia Code, all references codes and standards, and the attached EZ Standard, where included. Deviation from this standard shall result in permit revocation. A separate permit from the Philadelphia Department of Streets is required for any sidewalk and street closures. All means of pedestrian protection required at the site in accordance with the Philadelphia Building Code Chapter 33 shall be in place prior to start of work.
Nov 3, 2022 Completed Completed Dec 14, 2022
Installation of solar array in accordance with signed standard.
STANDARD · Opened Mar 12, 2017 · completed Apr 22, 2017
NOTICE OF VIOLATION · Opened May 16, 2025
Mar 9, 2017 FAILED
Apr 21, 2017 PASSED
May 16, 2025 FAILED
No building certifications matched this parcel in the fetched City dataset.
No business licenses matched this parcel in the fetched City dataset.
No appeals matched this parcel in the fetched City dataset.
City of Philadelphia OPA, L&I and Zoning Board records, shown as filed. A CLOSED investigation is an outcome label, not a missing visit; an appeal's application status and decision may differ.
Legal due diligence
These checks are triggered by this property’s actual City rows. They identify the controlling document to verify; they do not declare a use legal, a building safe, or title clear.
Why it mattersIssued work is not the same as approved final work. L&I uses final inspections and required certifications to close construction permits; expired, withdrawn, and completed are different City statuses.
Verify nextOpen the permit file and confirm final inspections, holds, and any resulting occupancy certificate.
Open the controlling City guidance ↗Why it mattersOpen notices can accrue fees, block permits or license renewal, and move to court or collection. Standard initial notices generally have a 30-day appeal window; unsafe or imminently-dangerous notices have a much shorter window.
Verify nextRead the notice—not only the summary status—and confirm reinspection, fees, and appeal posture with L&I.
Open the controlling City guidance ↗Why it mattersA PASSED or FAILED value applies to that inspection visit. CLOSED is a separate source status; none of the three alone proves the parent permit or violation case closed—or describes today’s condition.
Verify nextOpen the parent case/permit for each material failure and confirm its later disposition.
Open the controlling City guidance ↗Why it mattersPhiladelphia limits Homestead to an owner’s primary residence. The City says a deed change can require a new application or update.
Verify nextA buyer should apply in their own name and not assume the seller’s benefit continues.
Open the controlling City guidance ↗The seller must obtain Philadelphia’s certificate showing the base zoning, last use in the zoning record, and open violations. The City warns that it does not prove Building Code occupancy or show zoning overlays.
Next: Obtain the fresh certificate and compare it with the CO, permits, and Atlas overlays.
Official guidance ↗The Tax Center Property Payoff covers Real Estate Tax, Commercial Trash, and L&I abatement-work invoices. Philadelphia says it does not include business-tax debts or liens, water and sewer charges, or fines for code violations.
Next: Request the City statement effective through settlement; read every period and invoice.
Official guidance ↗OPA ownership, deed summaries, and a zero tax balance are not clear title. Mortgages, judgments, municipal claims, water liens, easements, heirs, and other encumbrances require separate searches.
Next: Use a Pennsylvania lawyer/title company and obtain owner’s title insurance; order the separate water search/payoff.
Official guidance ↗Separate water-lien guidance ↗LOOP and low-income or senior Real Estate Tax freezes depend on the qualifying owner and continued program eligibility; a buyer cannot assume the seller’s capped or frozen bill continues. A separately verified property abatement often remains with the property for its remaining term, but program-specific new-owner filing, use, and tax-compliance conditions still must be confirmed—not inferred from the reduced assessment alone.
Next: Have Revenue or OPA identify every current benefit, model the buyer’s bill without seller-specific relief, and confirm any verified abatement in writing.
Official guidance ↗Separate water-lien guidance ↗For a covered Pennsylvania residential transfer, obtain the statutory seller disclosure. It reports the seller’s knowledge; it is not a warranty, title search, code review, or substitute for inspections. Because OPA dates this building before 1978, separately obtain the required federal/City lead disclosures and any test results.
Next: Have the agreement and disclosure reviewed for this transaction’s coverage and exceptions.
Official guidance ↗Informational only—not a legal opinion, title report, code inspection, tax payoff, or substitute for a Pennsylvania lawyer, title company, inspector, or tax professional.
Rule-based groupings across this property's dated public records. Each flag shows the records that belong in the same verification step and where the inference stops.
More than one separately dated public record deserves a current-status check.
Evidence: 1 open L&I violation · failed L&I inspection activity in 2025
Limit: A screening signal, not a foreclosure prediction. Tax entries are historical and must be verified with Philadelphia Revenue.
A recorded purchase followed by 1 permit event matches the early part of a renovate-and-resell sequence.
Evidence: purchase recorded in 2021 · permit activity in 2022
Limit: This does not show that the property is listed or that a sale is planned.
The assessment jumped 101% in 2025, but no matching permit appears in the property timeline.
Evidence: assessment moved from $92,000 to $184,900 · no permit shown in 2024-2026
Limit: Not proof of unpermitted work; reassessment, corrected data, or a permit under another parcel can also explain it.
Transparent record rules, not a score or forecast. Each flag is a prompt to verify the cited records, not a prediction or allegation.
The record, translated into moves — what a buyer, the owner, and a landlord would each want to check next under Philadelphia's actual rules.
Federal law requires a lead-paint disclosure at sale for any pre-1978 home. If it will be rented, Philadelphia also requires a lead-safe or lead-free certificate before a rental license can issue.
Single-family rowhouse (the classic Philly row). Converting to a duplex or apartments needs a use variance the zoning board rarely grants — Pennsylvania courts require a physical hardship of the lot itself, and economics alone do not qualify.
Most L&I appeals must be filed within 30 days; unsafe or imminently dangerous orders can carry a shorter deadline. Unresolved notices can lead to fees, court enforcement, City abatement work, and liens. Read the dated notice and verify its current status with L&I.
Derived from the fetched property records and linked City guidance as of 2026. Assessment treatment is not a substitute for an exemption approval, live balance, title report, license, occupancy certificate, or inspection. Informational only — not legal, tax, or investment advice.
How this house has moved and where it's pointed: the city's assessed value (not a listing price) over 12 years, charted against its block; appreciation is that history's pace, and the 5-year figure simply extends it. Yield estimates rent-vs-price from area rents. Ask the record to dig into any number.
Value vs. the block, over time — sales, permits & L&I events marked on the line
Bought for $65K in 2007, demolition permit in 2017, sold for $179K in 2021 (+175%).
Flags: 1 open L&I violation. Informational only — not investment advice or a consumer report (FCRA).
The city assessor's field record — the physical spec sheet behind the assessed number.
OPA field-assessment attributes. Condition and grade are the assessor's codes, not an inspection.
What owning 1832 W Champlost Ave takes, at your price and your rate. Taxes start with an annual estimate from the City’s taxable assessment, not a current bill or balance; rent starts at the area median. Assessed value is not an asking price — set the price slider to the real one.
When this house last sold (2021) a 30-year mortgage ran about 2.96% — Freddie Mac's average that year.
Estimates for orientation, not advice. Assumes a 30-year fixed loan, $1,400/yr insurance, 1% of price/yr maintenance; taxes use this parcel's taxable assessment, not a live Tax Center balance.
1832 W Champlost Ave sits on the 1800 block of W Champlost Ave. Open the block report to compare its parcels, ownership and public-record history.
See the whole block →Next door: 1830 W Champlost Ave · 1834 W Champlost Ave
This report was assembled Jul 10, 2026, 1:59 AM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.
Official city record ↗ · L&I history ↗ · See the whole block · Download this record (JSON)