2026 taxable assessment $0 × 1.3998%. Estimate—not a bill or account balance.
OPA also publishes a 2027 assessment of $6,447,600; it is not the 2026 billed-year value.
Property report
39,555 sqft · RM1 · built 1956
School · School District Of Phila · fully tax-exempt (2026 OPA). On the 1800 block of Green St.
“Open” reflects records available then historical records keep their source dates estimates are labeled
These curated questions are free. Choose one to open its cited answer.
BlockReport can explain a discrepancy, but it cannot rewrite an official City record. Use the agency that owns the underlying fact:

Property tax
BlockReport can calculate the annual tax from the City’s taxable assessment. Payments, credits, interest, and a current amount due live separately in Philadelphia Tax Center.
2026 taxable assessment $0 × 1.3998%. Estimate—not a bill or account balance.
OPA also publishes a 2027 assessment of $6,447,600; it is not the 2026 billed-year value.
A Tax Center balance is net of bills, payments, credits, interest, and adjustments. A credit—or an amount due—is not automatically “back taxes.”
OPA 7822074052026 OPA shows a zero or de minimis taxable assessment. The open assessment split does not establish the exemption's legal basis, continuing eligibility, or treatment after a transfer.
This parcel did not match the June 2022 delinquency snapshot. That absence does not confirm the account is current today.
For a purchase, refinance, or closing, request the City’s official Property Payoff statement in Tax Center under “More options.”
Owner pulled a addition and/or alteration permit in 2024.
View supporting records →The assessed value hasn't moved once in 10 years of records while the city around it repriced. That usually means the parcel is falling through the reassessment process, not that its value is flat.
View supporting records →City Property History
Every row successfully fetched for this report is counted below. Dataset availability and matching can differ from the City's interactive file; use the official link for current detail.
Jun 18, 2008 COMPLETED Completed Oct 30, 2008
WATER HEATER AND BFP
Jun 19, 2008 COMPLETED
BOILER ROOM NEW LIGHTING, BRANCH PANEL BOARDS, NEW WIRING, DEMOLITION, EQUIPMENT CONNECTS AS PER 2005 NEC (EAST DISTRICT)
Mar 31, 2011 COMPLETED Completed Aug 6, 2011
APPLICATION OF A STAINED GLASS WORK ON EXT OF SCHOOL
Sep 29, 2015 COMPLETED Completed Sep 29, 2015
FOR THE RELOCATION OF LOT LINES TO CREATE TWO (2) LOTS FROM ELEVEN(11) ZONING LOTS (1801-17 GREEN ST THROUGH TO 1800-18 MOUNT VERNON ST, 1821, 1823, 1825, 1827 GREEN ST, 1820, 1822, 1824, 1828, 1830, 1832 MOUNT VERNON ST)[ONE(1) OPA ACCOUNT AND ONE(1) DEEDED LOT 1801-27 GREEN ST] AS PER ATTACHED PLAN.
Jan 10, 2024 Completed Completed May 15, 2026
Upgrade the existing building electrical service to 208 Volt, 3 Phase, 4 Wire service. Remove and replace all electrical panels, feeders, disconnect switches, conduit, wiring and meters. Remove existing generator and replace with an outdoor life safety rated generator with associated transfer switches and controls. Replace existing interior and exterior lighting with led lighting systems on new circuits from new lighting panels. Provide new lighting controls in compliance with applicable Philadelphia energy codes. Remove and replace the existing fire alarm system including all panels, boxes, conduits, cables, and associated appurtenances. Provide a new voice evacuation fire alarm system. Provide electrical receptacles in classrooms. Provide new electrical receptacles for new window mounted AC units. Provide site work. Provide concrete pad(s) to support new outdoor electrical equipment. Provide WI-FI clocks in locations as shown on plans. Provide new CAT-6 receptacles, cabling, conduit, and patch panels. Provide telecommunication upgrades. Replace the analog surveillance system with a new surveillance system. Provide Wireless Access Points (WAP). Provide window mounted AC units. ALL WORK IS TO BE DONE ACCORDING TO APPROVED DRAWINGS-2017 NEC,2016 NFPA-72,2018 PHILA FIRE CODE
STANDARD · Opened Aug 3, 2007
STANDARD · Opened Jun 13, 2008 · completed Dec 15, 2010
NOTICE OF VIOLATION · Opened Jul 8, 2020 · completed Jul 12, 2023
NOTICE OF VIOLATION · Opened Jul 26, 2021 · completed Jul 12, 2023
NOTICE OF VIOLATION · Opened Jul 21, 2022 · completed Jul 12, 2023
NOTICE OF VIOLATION · Opened Jul 14, 2023 · completed Jul 8, 2024
NOTICE OF VIOLATION · Opened Jun 28, 2024 · completed Jun 4, 2025
NOTICE OF VIOLATION · Opened Jun 3, 2025 · completed Jun 8, 2026
NOTICE OF VIOLATION · Opened Jun 8, 2026
Aug 2, 2007 FAILED
Oct 23, 2007 FAILED
Jun 12, 2008 PASSED
Jun 12, 2008 PASSED
Jun 12, 2008 FAILED
Mar 6, 2009 FAILED
Mar 2, 2010 FAILED
Dec 14, 2010 PASSED
Jul 8, 2020 FAILED
Jul 26, 2021 FAILED
Jul 21, 2022 FAILED
Jul 12, 2023 PASSED
Jul 12, 2023 PASSED
Jul 12, 2023 PASSED
Jul 14, 2023 FAILED
Jul 1, 2024 FAILED
Jul 8, 2024 PASSED
Jun 4, 2025 PASSED
Jun 4, 2025 FAILED
Jun 8, 2026 FAILED
Jun 8, 2026 PASSED
Inspected Dec 27, 2023 Certified Expires Dec 27, 2024
Inspected Jan 30, 2024 Certified Expires Jan 30, 2025
Inspected Jan 11, 2025 Certified Expires Jan 11, 2026
No business licenses matched this parcel in the fetched City dataset.
No appeals matched this parcel in the fetched City dataset.
City of Philadelphia OPA, L&I and Zoning Board records, shown as filed. A CLOSED investigation is an outcome label, not a missing visit; an appeal's application status and decision may differ.
Legal due diligence
These checks are triggered by this property’s actual City rows. They identify the controlling document to verify; they do not declare a use legal, a building safe, or title clear.
Why it mattersOpen notices can accrue fees, block permits or license renewal, and move to court or collection. Standard initial notices generally have a 30-day appeal window; unsafe or imminently-dangerous notices have a much shorter window.
Verify nextRead the notice—not only the summary status—and confirm reinspection, fees, and appeal posture with L&I.
Open the controlling City guidance ↗Why it mattersFire-protection certifications apply to the named system and inspection period only; they are not a whole-building safety certificate. Philadelphia generally requires annual sprinkler, standpipe, fire-alarm, special-hazard, and emergency-power inspections where those systems exist.
Verify nextRequest the correction/reinspection and current filed certificate.
Open the controlling City guidance ↗Why it mattersA PASSED or FAILED value applies to that inspection visit. CLOSED is a separate source status; none of the three alone proves the parent permit or violation case closed—or describes today’s condition.
Verify nextOpen the parent case/permit for each material failure and confirm its later disposition.
Open the controlling City guidance ↗Why it mattersA $1 or nominal deed can be a valid family, estate, or entity transfer. It does not establish a sale price, clear title, or by itself prove a tangled title.
Verify nextRead the recorded deed and have the title search confirm every grantor, grantee, estate/probate step, lien, and authority to sell.
Open the controlling City guidance ↗Why it mattersFull OPA exemptions can have different legal bases, including government, religious, charitable/institutional, veteran, or other treatment. The current owner/use record is not a buyer’s tax forecast.
Verify nextConfirm the exact exemption basis, buyer eligibility, and next tax-year treatment directly with OPA.
Open the controlling City guidance ↗Why it mattersPhiladelphia charges qualifying small commercial, mixed-use, and multi-unit properties that use City collection; exemptions and private collection can change applicability. A use category alone does not prove a fee is due.
Verify nextCheck the Commercial Trash account inside the date-effective Property Payoff.
Open the controlling City guidance ↗The seller must obtain Philadelphia’s certificate showing the base zoning, last use in the zoning record, and open violations. The City warns that it does not prove Building Code occupancy or show zoning overlays.
Next: Obtain the fresh certificate and compare it with the CO, permits, and Atlas overlays.
Official guidance ↗The Tax Center Property Payoff covers Real Estate Tax, Commercial Trash, and L&I abatement-work invoices. Philadelphia says it does not include business-tax debts or liens, water and sewer charges, or fines for code violations.
Next: Request the City statement effective through settlement; read every period and invoice.
Official guidance ↗OPA ownership, deed summaries, and a zero tax balance are not clear title. Mortgages, judgments, municipal claims, water liens, easements, heirs, and other encumbrances require separate searches.
Next: Use a Pennsylvania lawyer/title company and obtain owner’s title insurance; order the separate water search/payoff.
Official guidance ↗Separate water-lien guidance ↗Informational only—not a legal opinion, title report, code inspection, tax payoff, or substitute for a Pennsylvania lawyer, title company, inspector, or tax professional.
Rule-based groupings across this property's dated public records. Each flag shows the records that belong in the same verification step and where the inference stops.
More than one separately dated public record deserves a current-status check.
Evidence: 7 open L&I violations · failed L&I inspection activity in 2021, 2022
Limit: A screening signal, not a foreclosure prediction. Tax entries are historical and must be verified with Philadelphia Revenue.
Transparent record rules, not a score or forecast. Each flag is a prompt to verify the cited records, not a prediction or allegation.
This is a school, not a home, and OPA shows a full or near-full assessment exemption whose basis must be verified. A $0 assessment-based tax estimate does not prove the live Tax Center account has no prior-period balance or other charges. Homeowner investment tools are hidden; the assembled public-source record remains below.
7 open violations
School District Of Phila · corporate / LLC owner
• Owns 304 properties across Philadelphia under this name, assessed at $2.5B combined
• Tax bills mail to 440 N Broad St, Philadelphia PA, 19130
Places where the city's own paperwork disagrees with itself. These are flags on the data — not problems with the property.
The assessed value hasn't moved once in 10 years of records while the city around it repriced. That usually means the parcel is falling through the reassessment process, not that its value is flat.
1801-17 Green St sits on the 1800 block of Green St. Open the block report to compare its parcels, ownership and public-record history.
See the whole block →Next door: 1819-27 Green St · 1831 Green St
This report was assembled Jul 10, 2026, 2:31 AM ET. Available City datasets are queried from OpenDataPhilly (phl.carto.com) and the cited City ArcGIS feeds; record queries paginate rather than silently taking a first page. For this property: Permits: queried · Violations: queried · Investigations: queried · Appeals: queried · Licenses: queried · Building certifications: queried. “Unavailable” means the source query failed or was not supplied, not “no record.” Reports re-pull on view after seven days and on an overnight rolling schedule; citywide benchmarks recompute weekly. Source dates still govern: the parcel-level tax-delinquency snapshot is June 2022 and the separate detailed tax ledger ends in 2016, so neither establishes today’s balance. The live balance and date-effective payoff must be verified in Tax Center. AI-written passages are grounded in the assembled record and rejected if they state a number the record does not hold.
Official city record ↗ · L&I history ↗ · See the whole block · Download this record (JSON)